Laserfiche WebLink
I <br />PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601. <br />0 Connect side sewer per City Standard #'s 601, 602, 604 <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2 The approximate size trench is 3 5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />The contractor must meet with the Public Works Inspector to du,uss potential drainage routing prior to <br />beginning the project. Call Randy Allen at 425-339-7403 // Call i iK Lindman at 425.339-7404. <br />10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />11 Install erosion control measures per City of Everett Standards for small parcels <br />12 Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted <br />site No wasting of material is allowei on this building lot. <br />14. No dirt, mud, rocks or debris to be tracked onto roadway. <br />15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />20. Pave to existing paving in alley. <br />21 Contact the Water District for connecting provisions for this building's water and <br />sewer services. <br />22 A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23 If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br />13D. <br />Your Public Works Inspector is Cliff Lindman. Call him at 425-339.7404 for questions and inspections <br />pWComm lsIRevsW618111 <br />