Laserfiche WebLink
NWEC Lowrise Residential Compliance Check List <br />CHECK ONE OF THE COMPLIANCE OPTION BOXES AT THE TOP OF THE TABLE. IF YOU <br />CHOOSE A CHAPTER 6 OPTION, DO NOT DEVIATE FROM THE LISTED VALUES OF THE <br />COLUMN. IF YOU ARE USING A CHAPTER 4, 5, OR 7 APPROACH, INSERT YOUR DOCUMENTED <br />VALUES INTO THE RIGHT SIDE COLUMN. TRANSFER VALUES FROM YOUR CHOSEN OPTION <br />COLUMN TO THE FOLLOWING PAGES AS INSTRUCTED. <br />COMPLIANCE <br />REQUIRED <br />VALUES <br />APPROVED „ <br />❑ COMPONENT: <br />Ceiling flat <br />vaulted <br />S, 1 <br />C E <br />0 0 <br />m a� <br />N N <br />7 7 <br />C C <br />E E <br />c c <br />to m <br />n a <br />m m <br />v v <br />0 0 <br />LL LL <br />apter 6, Table 6.1, Prescriptive Appro <br />OPTION I OPTION II OPTION III OPTION <br />❑ ❑ ❑ ❑ <br />338 R38 R38 R38 <br />R38 J R38 <br />R38 (R38 <br />Wall <br />R19AO <br />R24A' <br />R19 <br />R19 <br />Below grade wall: <br />interior <br />R19 <br />R19 <br />R19 <br />A19 <br />or exterior <br />R10 <br />R10 <br />R10 <br />R10 <br />Floor <br />R30 <br />R19 <br />R19 <br />R19 <br />Slab on grade <br />R10 <br />R10 <br />R10 <br />R10 <br />Doors + Frame <br />U.19 <br />U.19 <br />U.19 <br />U.22 <br />(R5.26) <br />(R5.26) <br />(R5.26) <br />(R4.55) <br />Glazing max: <br />U-value <br />U.40 <br />U.40 <br />U.50 <br />U.60 <br />of floor 115% <br />15% <br />18% <br />15% <br />Solar allowance <br />N.A. <br />N.A. <br />(see <br />N.A. <br />602.8.3) <br />Heat pump: <br />Chapters <br />1, 5, or 7 <br />Approach <br />Qr R <br />u. 2L <br />U._ <br />N.A <br />HSPFMin. <br />N.A. <br />N.A. <br />N.A. <br />6.8 Z <br />Air leakage <br />STD. <br />STD. <br />STD. <br />STD. snip <br />^d� <br />(Wall lnwlsted <br />flowoption) <br />(Well lneulotod <br />wall option) <br />(Soler <br />option) <br />(Hoot pump <br />option) <br />Compliance Calculations must be submitted to Justify all R and U•Values listed for <br />the Chapter 4, 5, or 7, Option V Approach. <br />(Work forms are available at the <br />building department counter.) <br />mbols used: • The "A" des lgnstlon for wall In sulatlon requires Advanced Framing Techniques (wells only) <br />WEES APnIL 90 Page 2 Of 7 <br />