Laserfiche WebLink
Date <br />Application Fol <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />M IPublic ii PerMll • —0- % <br />Bldg Debt • / <br />i <br />Public Worb Fee <br />Total Fee <br />Lest APPI Fee Paid $ — <br />Balance Out 5 l <br />__ j— <br />r� ter of ��1S /� �J/ <br />Deacrlb Proposed Work <br />/7o2'r <br />Project Address (it known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Cenlerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls for Inspection shell be made 24 hrs. In advance - phone 259.8810, <br />2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Cell Location Underground Service 48 him before you dig. TOLL FREE NUMBER 1.800-424.5555. <br />Approved,W,C ruction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />W <br />PUBLIC WORKS DEPARTMENT <br />3200 Ceder Street <br />Everett, WA 98201 <br />Phone: 259-8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />z <br />O <br />F.. <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages costs. <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />ap Ilad for and further agrees to remove same upon notice from the <br />City a o apiece public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />