My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2314 74TH ST SE 2018-01-02 MF Import
>
Address Records
>
74TH ST SE
>
2314
>
2314 74TH ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 12:46:48 PM
Creation date
4/17/2017 11:07:22 PM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
2314
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCE NWEC Lt+JVRISE RESIDENTIAL t;OrvtPLIANCE CHECKLIST - <br />REQUIRED <br />Electrically heated dwellings, S 3 stories, Zone 1, Western Washington <br />INSPECTION -'& •- <br />APPROVED IMPORTANT: Please supply Information requested In the appropriate <br />shaded boxes below. Disregard boxes that don't describe your building or <br />equipment. Do NOT place checks In the two left columns. <br />TION PHASE <br />❑ Lo <br />(including rim Joists) will be insulated withoutcompression to: <br />R-19bolt (CIn options I,III,IV) ❑ R-24 (Ch #6,Optlon Iq � R-� I(Ch # 4 oI® <br />w grade walls not insulated on the exterior (See FOUNDATION PHASE) will be insilated to: <br />R-19(Chapter 6, all Options) on the Interior ❑ R-- (Chapters 4, 5, or 7) on the Interior. <br />❑ ❑ ed ceilings will be Insulated without compresslon to: H38(Ch q6, all options) ❑ R_(Ch N4 or 5) <br />❑ ❑ Skylight well Insulation is Installed and equivalent to the required wall R-values <br />(Recom Iendalion: place coiling Insulation baits in place behind skylight wells) <br />Vapor retarders will be Installed toward the war rface as represented below: <br />Select one option for floors, walls, and appropr to c Ilings: <br />Floors: W Plywood labeled EXPOSURE Poly (a 4 backed baits ❑ PVA <br />Walls: Poly plastic (2 4 Mil) ❑ ba ked batts PV <br />Ceilings Not required where ventilation space average 2" a ove Ins tlo <br />LJPOIy plastic ( 4 MII) 0 PVA <br />❑ backed ba i <br />EllfHeating system efflclency and slz g requirement; will be met as represented below: <br />Maximum heating system capacity (1500° 1 design heat load) has been calculated at '7 KW <br />Heat Pump OfI[Clancy will be met under following compliance path: <br />❑ Ch 116, Option IV: air source heat pum , HSPF 2 6.8 <br />❑ Ch k5 air source heat pump: HSPF 2 6.8, OP z 2.7/2.0 <br />❑ Ch N5 water source heat pump: COP> 3.0 <br />Healing system requirements will Is met with ollowing system: <br />Mir. h'odel M Max. output f W <br />Type HSPF <br />_ COP <br />NWEC Insr at ` hase a Ire ants: <br />Approved b _ J <br />Date <br />WEEK APRIL 90 <br />Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.