Laserfiche WebLink
TO POSTING'-"-" <br />Date <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type anly <br />Applicant <br />Describe Proposed Work <br />Mailing Address <br />Project Address lit known) _—Z 3 1. Zr — <br />T41 --T- ,C- <br />PnUAa works Permit •T �/ <br />oleo oePr + _qYl <br />P.bnc Work. Fait <br />Tatei re. S <br />Less soot rise Pnd S <br />Balance Due $�� <br />Zip Phone <br />Attach fow (4) copios of plans for proposed work - Draw to scale and note the lollowing as applicable. <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls for Inspection shall be made 24 hrs. in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 his, before you dig. TOLL FREE NUMBER 1-800.424.5555. <br />�k1 <br />Approved for Construction Dale <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everetl PUBLIC WORKS DEPARTMENT <br />3200 Ceder Street <br />Everett, WA'38201 <br />Phone: 259-8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />no <br />W <br />0 <br />Im <br />O <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm. <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other righPul-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property da aged thereby <br />Signature of App scant Dale <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />