Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />07/28/1998 Page 2 <br />------------- --------- <br />Date Range :06/24/1900 - 07/28/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101236730264 <br />Item Range :<Blank> - WVL36941,05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101236730264 (continued) <br />Vehicles: <br />ID <br />Description <br />Hours <br />Cost <br />---------- <br />------------ <br />V0058 <br />------------------------------ <br />198 <br />CHEV 1/2 T 4X4 PU <br />------ <br />8.00 <br />47.20 <br />V2112 <br />91 <br />CHEV 1 TON <br />4.00 <br />24.40 <br />V2225 <br />88 <br />FORD BYD <br />4.00 <br />61.36 <br />V2230 <br />91 <br />FORD F800 DUMP 5 YARD <br />28.00 <br />28.00 <br />V2231 <br />90 <br />FORD DUMP 5-YARD <br />12.00 <br />123.60 <br />V3200 <br />80 <br />CASE VIBROMAX W25 ROLLER <br />4.00 <br />75.44 <br />V3603 <br />86 <br />CASE BACKHOE 780 <br />4.00 <br />155.60 <br />V6401 <br />80 <br />CASE FLATBED TRAILER <br />4.00 <br />0.00 <br />VH0012 <br />'97 <br />CAT BACKHOE <br />40.00 <br />1136.00 <br />VJ0004 <br />'95 <br />CHEV 1-TON <br />40.00 <br />232.00 <br />VJ0017 <br />196 <br />FORD 5 YARD <br />4.00 <br />61.92 <br />VJ0019 <br />'96 <br />FORD 1 TON <br />4.00 <br />23.20 <br />Total Vehicle Cost: 1968.72 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />LOWER 12" DRAIN LINE THAT WAS INSTALLED LAST WINTER. <br />INSTALLED 2 CB 151S. LAID HANCOR PIPE OVER BANK <br />*NOTE* NEEDS TUMMS NUMBER ASSIGNED <br />Total cost for work order 7101236730264: <br />5146.48 <br />