Laserfiche WebLink
i <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />02/08/1995 Page 1 <br />Date Range :01/09/1989 - 01/31/1995 <br />CM Work Order Range :0810800810001 - PW2664-30-321Pattern :7401196751091 <br />Item Range :<Blank> - WW22020001 Pattern <br />Program ALL Function ALL Activity ALL <br />--------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 7401196751091 Title: REPAIR 9 - 74TH ST SW <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS1284K029 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 01/26/1995 <br />Overall Craft: <br />Issued: 01/27/1995 Issued by: SKL Assigned to: <br />out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />Planned Hrs <br />Actual Hrs <br />Cost <br />----- ------------------------------------ <br />UL NSO NIELSEN, SCOTT 0. <br />----------- <br />0.00 <br />---------- <br />1.50 <br />---------- <br />24.84 <br />WST WDT WALDEN, DAROLD T. <br />0.00 <br />1.50 <br />30.12 <br />Total <br />Labor Cost: <br />54.96 <br />Materials: <br />ID <br />Description <br />Date <br /># Used <br />Cost <br />------------ <br />ADAP34000647 <br />------------------------------ <br />ADAPTER 3/4" FIP <br />X INSTA-TITE@ <br />-------- <br />01/30/1995 <br />-------- <br />1 <br />---------- <br />6.99 <br />C0RP34002147 <br />CORP STOP 3/4" <br />MIPXFLARE COP @ <br />01/30/1995 <br />1 <br />8.56 <br />COUP34142847 <br />COUPLING 3/4" <br />CTN X 3/4" MIP @ <br />01/30/1995 <br />1 <br />3.30 <br />PIPE34060647 <br />PIPE 3/4" POLY <br />Z.P.S. <br />01/03/1995 <br />4 <br />0.96 <br />Total Material Cost: 19.81 <br />Vehicles: <br />ID Description Date Hours Cost <br />------------ -------------------------------------- ---------------- <br />V2117 91 CHEV 1-TON HYD UNIT O1/26/1995 1.50 8.40 <br />V2139 86 CHEV 1-TON W/HYD. UNIT O1/26/1995 1.50 7.50 <br />Total Vehicle Cost: 15.90 <br />Total cost for work order 7401196751091: 90.67 <br />