My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2223 75TH ST SE 2016-01-01 MF Import
>
Address Records
>
75TH ST SE
>
2223
>
2223 75TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 11:13:10 AM
Creation date
4/17/2017 11:59:22 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
2223
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�;✓ . <br />V�"_ � <br />COST ESTIMA'iE SHEET <br />/ � <br />Receipt k �a.�/7 <br />X Cost of Work Order <br />Cost of Service Order <br />Contact Ferson Constance Carlson <br />Public Works Department <br />Utilities Division, 3200 Cednr Street <br />n/^ Everett, Washington 98201 <br />�n � (� L •� I �✓ `'. (42� 257-8800 <br />i� <br />L ,�/ <br />- ' ? � �/ Dare Paid <br />�- �y �� <br />� �lJqqp - � Work Order # <br />fV <br />� �c Works �RA rT �'Service Order � <br />Requested By Gordon Witcher <br />Property Owner (name) Greg & Constance Carlson <br />Charge Cast ro(name if different than owner) __ <br />Addrcss 2223 75th St SE <br />Inst�lla�ion Locntion Same <br />Ciry Everett <br />/ <br />Telephone {i (425)355-6877 <br />Date of Request 8-20-97 <br />Zip 98203 <br />Installation type!description/size/etc. Hydrant relocation. Expose pipe, install I I'/.° bend, 10' (±) 6" DI pipe, <br />relocate hydrant, backfill and restore area. <br />� Tlie following estimate is based upon thc Utilities Division providing all labor, equipment, matcrials, <br />restoration, and final hook-up. <br />� The following estimlte is based upon the Street Division work group providing all labor, equipment, <br />mareriels and restoration to property. <br />Plea�e notifv thc Citv of Everett Utilities Division 10 warkine davs in advancc of rcauireJ in�tnllnt:on date to <br />allow for scheduline �nd narts aracurement <br />Whenever the eslimnted cost is not suflicient to cover the tatnl ecpense for labor, mstarial, equipment rental and <br />administrative cosls, the deficit shuli be chnrged to the property for which such installation wns mude and the awner <br />thereaf, and prnvided further, thnt any excess payment shnll be returned to the person applying for the instulletion. <br />Itemized Cost Estim�te: <br />Labor 3c Benefits <br />Material <br />Equipment Rental <br />Surface Restaration <br />TOTAL <br />Prepared by: <br />Accepted by: <br />COSTAGt� Ctib�lanUu�:Q��t <br />I,O80.00 <br />I55.00 <br />344.00 <br />S I.579.00 <br />Datc Est. <br />Preoared: <br />8-20-97 <br />cc: Bldg. Pertnit Cenmr <br />Clair Olivers <br />Tom Thetford <br />Kirk 8rooks <br />Gordon Witchcr <br />Dan Lowell <br />Stan Mitchell <br />Paul McF:ec <br />iitm �'Nn1 <br />Representing: i'�� l ?o ,1 �✓�17ti--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.