My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2888-05
>
Ordinances
>
Ordinance 2888-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:03:17 PM
Creation date
8/7/2015 2:57:12 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2888-05
Date
12/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />ORDINANCE NO. 2888-05 <br />AN ORDINANCE amending and closing the special construction fund <br />entitled "Fire Station No.6 — Additions & Alterations", Fund 342, Program <br />004, as established by Ordinance No. 2500-00. <br />WHEREAS, the City Council recognized the need to remodel Fire Station No.6 located <br />at 9520 Evergreen Way; and <br />WHEREAS, Ordinance No. 2500-00 created the special construction project entitled <br />"Fire Station No.6 — Additions and Alterations", Fund 342, Program 004 to provide for <br />the design and construction costs required to construct additions and alterations to <br />existing Fire Station No.6; and <br />WHEREAS, additional funding is necessary to complete the construction of Fire Station <br />No.6 — Additions and Alterations; and <br />WHEREAS, with the additional funding provided by this Ordinance, the purpose of the <br />fund has been accomplished; and <br />WHEREAS, there are neither outstanding obligations of the fund to be paid nor <br />uncollected revenues to be received; <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1: Section 3 of Ordinance No. 2500-00 which reads as follows: <br />The estimated cost of the project is $630,000 including costs related to design, <br />construction, equipment, and contract administration. <br />Be and the same is hereby amended to read as follows: <br />The estimated cost of the project is $889,062 including costs related to design, <br />construction, equipment, and contract administration. <br />Section 2: Section 4 of Ordinance No. 2500-00 which reads as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.