Laserfiche WebLink
� <br />CLOSED CM WORIC ORDERS REPORT <br />Total Utilit;• Maintenance Management System <br />04/24/1998 Page 1 <br />____________________"____________________________________-__________________'___ <br />Date 'tange :01/09/198y - 04/14/1998 <br />CM Woz•k Order Range :08'�OB00810001 - UT2830-30-322Pattern :7101196751414 <br />Iterti Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Eunction ALL Activity ALL <br />___________________________'__________________________________________`_________ <br />CM WORK ORDER ID: 7101196751414 Title: REPAIR 501 75TH ST SE <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0785M026 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Ar_tivity 675 <br />Date Completed: 04/08/1998 <br />Overall Craft: <br />Issc•.d: U4/08/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST TDE1 <br />UL WTE <br />Materiale: <br />ID <br />ADAP39000547 <br />ADAP34000697 <br />BGX000065547 <br />COUP34142747 <br />ELL0341042a.7 <br />SETT341497}7 <br />Vehiclae: <br />ID <br />-------- <br />V2119 <br />VJ0026 <br />Isaued by: WMW Assigned to: TDE1 <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual ;irs Cost <br />------------------------- ----------- ---------- <br />Ci,VANAH, SHANE G. 0.00 1.:i0 21.77 <br />THOMPSON, DWAYNE E. 0.00 1.50 30.93 <br />WESTVANG, TERRY E. 0.00 1.SU 24.30 <br />Description <br />------------------------------ <br />ADAPTGR 3/4" MIP X INSTA-TITE� <br />ADAPTER 3/4" FIP X INSTA-TITE� <br />BOX METER CONC W/STEEL LID <br />COCTPLING 3/4" CTS COMP X MIPT� <br />GLL 3/4" 90 DEG STREET BRASS " <br />SET'PER COP 5/8" X 3/4" (H7") <br />To�al Labor Coet: <br />Date <br />04/09/1998 <br />04/09/1998 <br />04/08/1998 <br />04/09/1998 <br />04/09/1998 <br />04/09/1998 <br /># Used <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Description Hours <br />----------------------------- ------ <br />91 CHEV 5 YD 1.50 <br />'97 FORD 1 TON SVC TRUCK 1.50 <br />Total Vehicle Cost: <br />Total cost for worlc order 7101146751414: <br />Coat <br />15.90 <br />8.85 <br />24.75 <br />-----77.Od' <br />Cost <br />25.26 <br />7.73 <br />46.03 <br />4.11 <br />1.62 <br />38.66 <br />123.41 <br />225.16 <br />