My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
510 75TH ST SE 2016-01-01 MF Import
>
Address Records
>
75TH ST SE
>
510
>
510 75TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 10:42:28 AM
Creation date
4/18/2017 12:15:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
510
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br />Ltr. C.L3unncy <br />Au�ust 3, 2001 <br />Pagc 3 <br />�` 7) l�hc c�terior dccks (and posts supporting lhem) are iloodceiling assemblies that <br />` dcfinc floor arca per Scction 207 rcyiurc onc-huur pmtcction. Scction G06.1. <br />8) "Thc typical swir dctail on Shret A6 should sho�v a laycr of 5/8" ty�pc X GWB undcr <br />thc stairs for usablc spacc scparation. Scc�iun 1003.3.3.9 <br />����ss�n�uc�, <br />1) All units on thc ground floor that arc not 7ypc A, should comply with thc standardc <br />for Typc [3 per Scctiun I 103.I.R'. <br />Zl All Joors within Typc A units should provided thc mav�c ring cicaranccs at doors as <br />spccificd in ScGion I 10G.10.3. This will et7cct Ihc sccond bathroom, anJ bcdrooms Z <br />&3. <br />3) Completc cle��ations of acccssiblc bathrooms should be provided sho�ving thc <br />rcquircd muunting hcights and clearanccs. <br />41 A minimum of 3 Grab bars (blocking) shoulJ be provided fi�r the accessible bath :uh <br />in Typc A an� f3 units. Thcy shoulJ cumply ���iUi dre following based on Scction <br />11 OG. I 1.9.3: <br />a) l.owcr grab bars shoulJ be installed ccntercJ 9 incheti abo��e thc tub rim. <br />b) For the Type A tub — nvo 4R" long grab bars should be instailed on the wall <br />oppositc of the ciear floor spacc (onc above the other). <br />c) Pur thc Typc I3 tubs (tubs �cithout scats) — tao 24" long grab bars m�y bc <br />procided, ho�cever an additional bar must be insta;led on thc wall opposite the <br />iluor drain. It should extend at Ieast 12" f�om the cicar floor space. <br />>1 Pauccts :md other cuntrols for the T}�pe A and I3 bath tuhs should bc located above <br />Au rim and bclo�v the �rab bars - ol7set laterally from the clear iloor space bet��een <br />ihc opcn cJgc uf thc tub anJ thc mid-point of thc tub. Sec�ion I 106.11.9.�1 <br />61 1'hc latcral distancc from thc ccntcrlinc uf ��alcr closrts in 7�ypc A and B units (unc <br />minimum per unit) to thc tubs must he I R inches. Section I 106.1 I.>.I <br />7) 'fhc cut-shcrts litt th� futurc sidc grab bars at thc toilets should bc providcd (Typr A <br />and f3 unitsl. l he ban must be a minimum uf �J_' inches long and extend a minimum <br />ul ��1 inchrs I�mm thc rcur �call. ticction I I OG.I I.>. + <br />� � � � „ . ., �]/ <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.