My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
632 75TH ST SE 2016-01-01 MF Import
>
Address Records
>
75TH ST SE
>
632
>
632 75TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 10:27:52 AM
Creation date
4/18/2017 12:21:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
632
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bob I.andles, Planning Departme�� � �,�CI �Q��) <br />Public Works Department l/� <br />May 27, 1980 <br />S.E.P.A. Checklist Review //2l5 <br />Planning File p80-35 <br />PROPOSAL: <br />To cons� uct a nine unit apartment building at 632 - 75th Street. <br />PR(�pONENT: RAM Enterprises <br />RECOMMENDATIONS: <br />It is the recommendation of the Public Works Dep�rtment that issuance of <br />a Negative Dedaretion be subject to the following: <br />1. A detailed drawing shall be submitted to the Public Works Department <br />showing parking layout, landscaping, driveways, utilities, storm drainage, <br />end all requlred improveme.nts to the public right-of-way. Public Works <br />Department approval uf these drawings ls required before any permits <br />are issued. All Improvements shall be completed before the Occupancy <br />permit is [ssued. <br />2. City streets are to be kept dear oi dirt and debris during cc�struction. <br />3. During construction, :ill truck traffic to and from the site wi:iun the <br />City of Everett shall be on arterial streets unless otherwise �puroved <br />by the Public Works Department. <br />4. Street [mprovements and a Covenant of no-protest for a Local improvement <br />District in cunformance with city ordinances are requi-ed. <br />S. Ten feet oi additional right-of-way along the frontage of the site an <br />75th Street shall be deeded to the C[ty oi Everett. <br />6. Participation in the program to fund the north and south central santtary <br />sewer interceptor is required. <br />7. On-site detention is required. Drainage calculations are to be submitted <br />on a City of Everett drainage plan submission form. <br />8. Public Works Department approval of a temporary erosion control plan <br />is required prlor to commencing construction activities. <br />9. Reseeding oi ezposrd soils withln 30 days of constntction completion <br />is reyuired. <br />Amend �hecklist As Follows <br />11- 13- c, d and f- change ta yes. <br />KG:jcl <br />
The URL can be used to link to this page
Your browser does not support the video tag.