My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1220 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1220
>
1220 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:49:50 PM
Creation date
4/18/2017 12:36:42 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1220
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />KOL� <br />� <br />March 15, 1982 <br />The City of Everett <br />Oepartment of Public Works <br />3200 Cedar Street <br />Everett, Washington �8201 <br />Attn: Mr. Larry Crawford <br />RE: Paine Field Ir�dustrial Center (Job b0408) <br />Certificates of Occupancy <br />Dear Mr. Crawford: <br />As we had discussed recently, The Koll Company is actively pursuing the <br />closeout and completion of the above referenced project. We have been <br />delayed considerably due to weather conditions this winter and have been <br />unable to complete paving, curbing, striping, and landscaping. Four of <br />the six buildings are complete and ready for inspection for certificates <br />of occupancy, and we have requested that the city start the process. In <br />order to finalize this, we need your assistance. <br />The City of Everett presently has a$10,000 check from The Koll Company <br />submitted for work across 16th Avenue West in lieu of an assignment of <br />�avings account. Tliis was to assure completion of this work and to assure <br />that the street was returned in a condition satisfactory to the city. This <br />work is complete ar�d repair work to a section of asphalt pavement as re- <br />quested recently, is currently under way. <br />We rE+spectfully ask that this money not be returned immediately, and used <br />instead as a cash bond to guarentee Tl�z Koll Company's committment to <br />coinplete all landscaping, paving, striping and curbing for this project <br />as required per the city approved plans. We intend to finish this work <br />in a fast-track fashion when the weather permits. (Hopefully this will be <br />within about four weeks time). <br />We hope this will satisfy your requirements as to our intentions and commit- <br />tment and will allow you to sign the certificates of occupancy as soon as <br />possible. <br />� f� ��, �� Il �,�� ��� ���; � <br />�1lIR 15 lo^�. <br />2o2t �52nd A�����nue W E• ta�.,^r�„���,� . �';;�.i,�,�cton 9FC�-: .(2n�� r,:; �7���CITY OF EVERETT <br />Insp��;tion D, G�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.