My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
131 75TH ST SW 2016-01-01 MF Import
>
Address Records
>
75TH ST SW
>
131
>
131 75TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:36:18 AM
Creation date
4/18/2017 12:38:36 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
131
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side aewer per City Standard #601 <br />5. Connect side sewer per City Standard #'s 601, 602, 604 <br />f. Connect all rooflop downspouts to the side sewer. <br />7. Connect rooRop downspouts to the dreinage system prowded for thls lot <br />a Man(uaP3-2 6 2mThe appsoximate s�ze trench�s 3 5' wider�2r dteep ande25'Plong ' See altachme�t for <br />more details. <br />9. The contractor must meet wilh the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the projecl Call Rand Allen at 425-339-7403 // Call Clift Lindman at A25-339-7404. <br />10. Install erosion control measures as determined by lhe Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankels. <br />Install erosion control measures per City of Everett Standards for small parcels <br />Remove erosion conlrol measures upon compietion of the projecl prior to final approvai o( lhe permit <br />All excavaled material from foundation, sidewalk and driveways shall be hauled to an approved. <br />permitted site No wasting of material is allowed on this building lot <br />No dirt, mud, recks or debris to be lracked onln roadway. <br />No building materials to be stacked on sidewalk/roadv+ay and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />Adjust water meter box 1" above sidewalk grade <br />_ -� <br />(_17 Remove and replace curb, gulter and sidewalk as per City of Everell Standard Plan #'s 305A 8 30 on <br />� this proposal's frontage a. directed by lhe Public Works Inspeclor (i.e all �mused driveways and any <br />broken or damaged area must be replaced) <br />� <br />19 <br />20 <br />Instail a Type I concrete driveway per City of Everetl Standard #307 <br />Pave driveway irom lhe front property line out t� the street paving <br />Pave to existing paving in alley. <br />21. Contact the __ <br />sewer servicea <br />Waler DisVict for connecting provisions for this building's water and <br />22 A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23 If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across lhe public right-of-way. <br />�q A spnn�ler system is required for this building m compliance with the requirements of NFPA Slandards <br />13D <br />r;: , �, r,.,,i.r•i <br />
The URL can be used to link to this page
Your browser does not support the video tag.