My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 75TH ST SW CONTOUR AEROSPACE 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1415
>
CONTOUR AEROSPACE
>
1415 75TH ST SW CONTOUR AEROSPACE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:56:59 PM
Creation date
4/18/2017 12:44:46 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1415
Tenant Name
CONTOUR AEROSPACE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTOUR WOUSTRIES <br />7 November 199G <br />City of Everett <br />inspection Department <br />3200 Cedar St. <br />Everett, WA 98201 <br />Attention: Tim Alaniz <br />Reference: Our letter Jated 23 October 1996 <br />Dear Tim, <br />0 0u H NOV 131996 <br />11111 <br />CITY OF EVERE17 <br />Bldg. Permit Counter <br />Thank you for your timely consideration of our proposed deletion A ground fault <br />circuitry from a 6000 �-.mp switchboard at 1415 75th Street SW, Everett, WA. We have <br />reviewed the requirements with Mr. Lorne Wallitner of Rodgers Electric Company, and <br />understand the equip rent protection purpose of ground fault circuitry in our electrical <br />service. <br />We have reviewed the requirements specifically in regard to the three main fused <br />bolted pressure switches and have found that GFI protection should be provided for the <br />1,600 and 2,000 ar, ,) switches since the equipment connected to those feeders will not <br />provide an immediate health or injury hazard shculd power become unexpectedly <br />disconnected in the event of a ground fault. <br />Our main safety concern is the loads served by the 2,500 amp switch. The possibility of <br />injury from a power outagq on loads served by that section is significant enough that the <br />potential equipment damage is less important than the personnel hazard an outage <br />could produce. Therefore, with your department's approval, it is our plan to proceed <br />with ground fault protection eliminated from only distribution Section "A", fed from the <br />2,500 amp bolted pressure switch. <br />We trust that you will find the foregoing acceptable and we thank you for your <br />consideration and cooperation. <br />Sincerely Yours <br />el Convis <br />Engineering Manager <br />2916 100th St. S.W., Unit A, Everett, WA 96204.1474 a (206) 355-0616 9 Fax: (206) 355.7360 <br />
The URL can be used to link to this page
Your browser does not support the video tag.