My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1420 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1420
>
1420 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 9:00:03 AM
Creation date
4/18/2017 12:46:48 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1420
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOLL <br />March 15, 1982 <br />The City of Everett <br />Department of Public Works <br />3200 Cedar Street <br />Everett, Washin9ton 98201 <br />Attn <br />RE <br />Mr. Larry Crawford <br />Paine Field Industrial Center (Job N0408) <br />Certificates of Occupancy <br />_ ,—.+� <br />/J � <br />Oear Mr. Crawford: <br />�- <br />As we had discussed recently, The Koll Company is actively pursuing the <br />closeout and completion of the above referenced project. We have been <br />delayed considerably due to weather conditions this winter and have been <br />unable to complete paving, curbing, striping, and landscaping. Four of <br />the six buildings are complete and ready for inspection for certificates <br />of occupancy, and we iiave requested that the city start the process. In <br />order to frnalize this, we need your assistance. <br />The City of Everett presently has a 510,000 check from The Y.oll Company <br />submitted for work across 16th Avenue West in lieu of an assi9nment of <br />savings account. This �aas to assure completion of this work and to assure <br />that the street was returned in a condition satisfactory to the city. This <br />work is complete and i,epair wur{: to a secticn of asphalt pavement as re- <br />quested recently, is cin-rently under way. <br />We respectfully ask that this rnoney not be returned imrnediately, and used <br />instead as a cash bond to guarentee The Koll Coinpan,y's committment to <br />complete all landscaping, paving, striping and curbing for this project <br />as required per the city approved plans. We intend to finish this work <br />in a fast-track fashion when the weather pe rniits. (Hopefully this will be <br />within about four weeks time). <br />We hope Lhis will satisfy your requirements as to ou�� intentions and coininit- <br />tment anA will allow you to sign the certificates of occupancy as soon as <br />possible. <br />J <br />. .� .. . ., , . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.