Laserfiche WebLink
C � <br />FIG 10-17-2006(U) 13:37 <br />G.R. REG-1 W%19 <br />CT 1 <br />PERMIT N0.061M <br />Ev Err 1 PIC $99.61 <br />'1 $99.61 <br />(425) 257-8810 .,, I $99.61 <br />Plan Check No.: B0610-050 <br />Application Date: 10/17/2006 <br />Tenant: BOEING <br />Owner: 75TH ST CENTER LLC <br />Job Address: 1515 75TH ST SW <br />Proposed Use: <br />Description of Work: ADD COMPRESSOR ROOM TO OUTSIDE - <br />BOEING <br />Plan Check Fee Paid: $99.51 <br />The building permit application for the above -referenced project is being conditionally accepted for filing <br />pending the determination of its completeness. <br />If the City review determines that any additional land use approval or any additional information is <br />required to complete your building permit application, it will be necessary to submit this additional <br />information or acquire the additional land use approval prior to your application being considered complete <br />for filing. If no other land use approval or additional information is required, your building permit <br />application will be considered filed as of this date. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />z <br />(_ <br />lure Datc <br />FILE COPY <br />