Laserfiche WebLink
• ► e 910,14MMOR <br />Three (3) complete sets with site plans. Minimum scale: 1/8" = 1'-0". <br />`i" A. Architect's stamp. All projects of 4,000 square fc st or more than 4 dwelling <br />units require the )tans to be prepared by an architect currently licensed to practice <br />in the state of Washington (RCW 18.08) - Please note that an engineer's stamp <br />does not eliminate this requirement. <br />B. I-loor plan with complete dimensions (indicate entire building showing all exit <br />doors, stairs, corridors, etc.). <br />C. Building section with vertical dimensions indicating location of tenant <br />improvement, other tenants and building construction. <br />D. Wall sections indicating proposed construction and assembly rating as required <br />for occupancy separation, area separation or building construction. <br />4L E. Stair or ramp plans (1/4" = P-0" minimum scale) and sections. <br />✓ F. Toilet room plans (1/4" = 1'-0" minimum scale) and interior elevations indicate <br />wall and floor finishes, fixture dimensions, handicap accessories (if required) and <br />toilet accessories. <br />G. Door schedule (indicate frame and door rating, type of lock or latch and signage <br />if required). <br />H.1_ighting plan and energy budget calculations (indicate wattage of all fixtums, <br />include exterior building mounted lighting if added or revised). This must be <br />provided at the time of building permit application. <br />I. Energy calculations (any exterior wall or roof of existing buildings must be <br />insulated when the framing cavity is exposed when remodeling. Cavity must be <br />insulated to the maximum depth possible or to the depth indicated by energy <br />calculations). <br />f L J. Structural drawings and calculations (only required if altering a -isting structure <br />or adding ne-w load -bearing structure). <br />K. Copies of any permits/approvals i sual bg fhr. planning Department. <br />