My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 75TH ST SW MEDIA TECHNOLOGIES 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1515
>
MEDIA TECHNOLOGIES
>
1515 75TH ST SW MEDIA TECHNOLOGIES 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:20:41 PM
Creation date
4/18/2017 12:51:09 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1515
Tenant Name
MEDIA TECHNOLOGIES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Department <br />T . POSTING D R (rl (Z 0 ryt Utilities Division <br />ESTIMATE SHEET 15 l7 LS U Was Cedar Street <br />COST <br />D Everett, Washington 98201 <br />SEP - 9 1994 (206) 259-8800 <br />CITY OF EVERETT <br />....................... <br />Receipt H Public Works Dept. <br />Cost of Work Order S <br />X Cost of Service Order S _ 9.635.00 <br />Contact Person LeifA. Ford <br />Requested By Carroll Tollefson <br />Property Owner (name) _ Boeing <br />Charge Cost to (name if differciu than owner) <br />Address PO Box 3707 MS0211G <br />Installation Location 16th and 75111 St <br />Bocing Conuacrcial Airplane <br />Date Paid 9 -/"i <br />Work Order N <br />Service Order H � v1yr% <br />Telephone # 266-9467 <br />Date of Request 9/8/94 <br />City Seattle Zip 98124-2207 <br />98201 <br />Installation typc/dcscripliorlsizcictc. <br />Materials and labor for replacing R" single check to a R" double check: also a <br />new utility vault <br />The following estimate is based upon <br />the Utilities Division providing all labor, equipment, materials, restoration, and <br />P final hook-up. <br />The following estimate is based upon <br />the Street Division work group providing all labor, equipment, materials and <br />❑ restoration to property. <br />'- Whenever the estimated cost is not sufficient <br />to cover the total expense for labor, material, equipment rental and <br />installation was made and the owner <br />administrative costs, the deficit shlall be <br />charred to the properly for which such <br />shall be returned to the person applying for the installation. <br />thereof, and provided further, that any <br />excess payment <br />Itemized Cost Estimate: <br />Labor & Overhead S <br />3.250.00 cc: Bldg. Permit Counter <br />Clair Olivcrs <br />Material <br />5,529.00 Tom Thetford <br />_ <br />Don Wcilkamp <br />Equipment Rental <br />Kirk Brooks <br />8 `G.00 <br />Gordon Witcher <br />Dan Lowell <br />Surface Restoration <br />Stan Mitchell <br />TOTAL S <br />9.635.00 <br />Prepared by: John Gan/1 , <br />Accepted by: MAC L (.�%SUr� <br />j)o�' 3 986,7/(D <br />cosreceoac uxsr 19ava <br />Representing: --80'E' /4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.