My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 75TH ST SW TRAMCO 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1515
>
TRAMCO
>
1515 75TH ST SW TRAMCO 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 2:21:46 PM
Creation date
4/18/2017 12:54:49 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1515
Tenant Name
TRAMCO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />UNIKON&I;lf" I 191H 0101403_ <br />Throe (3) complete sets with site plans. Minimum scale: 1/8" = 1'-0". <br />A. Architect's stamp. All projects of 4,000 square feet or more than 4 dwelling <br />units require the Plans to be repared ban architect currently licensed to practice <br />in the state of Washington RN 18.&) - Please note that an engineer's stamp <br />does not eliminate this requirement. <br />B. Floor plan with complete dimensions (indicate entire building showing all exit <br />doors, stairs, corridors, etc.). <br />A C. Building section with vertical dimensions indicating location of tenant <br />improvement, other tenants and building construction. . <br />D. Wall sections indicating proposed construction and assembly rating as required <br />for occupancy separation, area separation or building construction. <br />4L E. Stair or ramp plans (1/4" = 1'-0" minimum scale) and sections. <br />tJ A F. Toilet room plans (1/4" = 1'-0" minimum scale) and interior elevations indicate <br />wall and floor finishes, fixture dimensions, handicap accessories (if required) and <br />toilet accessories. <br />â G. Door schedule (indicate frame and door rating, type of lock or latch and signage <br />if required). <br />I H. Lighting plan and energy budget calculations (indicate wattage of all fixtures, <br />include exterior building mounted lighting if added or revised). This must be <br />provided at the time of building permit application. <br />I. Energy calculations (any exterior wall or roof of existing buildings must be <br />insulated when the framing cavity is exposed when remodeling. Cavity must be <br />insulated to the maximum depth possible or to the depth indicated by energy <br />calculations). <br />-`fâ J. Structural drawings and calculations (only required if altering existing structure <br />or adding new load -bearing structure). <br />K. Copies of any permits/approvals issued by the Planning Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.