Laserfiche WebLink
PRIVATE WORK <br />Item Unit Quantitv Unit Price Amount <br />STORM SEWERS <br />4-6 inch pipe <br />L.F. <br />6.00 <br />8 inch pipe <br />L.F. <br />16.00 <br />12 inch pipe <br />1,065 L.F. <br />22.00 <br />$23,430.00 <br />18 inch pipe <br />1,062 L.F. <br />33.00 <br />52,866.00 <br />21 inch pipe <br />300 L.F. <br />38.50 <br />11,550.00 <br />Yard Basin <br />Ea. <br />100.00 <br />Standard Catch Basin 7 Ea. 700.00 4,900'.00 <br />Extra Depth Excavation, <br />(over 12' deep) 947 Ft/L.F. 2.00 1,894.00 <br />48 inch MH/CB Type II 5 Ea. 1300.00 6,500.00 <br />54 inch MH/CB Type II 2 Ea. 1800.00 3,600.00 <br />Extra Depth ME/CB <br />48 inch 17.28 Ft. 110.00 1,901.00 <br />Per ft. over 12' <br />Extra Dept' MH/CB <br />54 inch 2.42 Ft. 140.00 339.00 <br />Per tt. over 12' <br />Restrictor I Ea. 1,700.00 <br />72 inch MH/CB Type I1 1 Ea. 2,400.00 2,400.00 <br />Other: Extra depth MH/CB 72 inch <br />per foot over 12 feet 15.5 Ft 187.00 2,899.00 <br />STORM SEWERS TOTAL $ 114,000.00 <br />-9- <br />