Laserfiche WebLink
2. City streets and alleys are to be kept clear of dirt and debris at all <br />times during construction. Dust suppression and street cleaning must <br />occur as directed by the Public Works Inspector. <br />3. Permits are required for destination of fill within the Everett City <br />limits. <br />q. A one-year guarantee is required on the public street, utility and site <br />landscaping for an amount not less than 10% of the cost of construction <br />and shall run for one year from the date of issuance of the first <br />Occupancy Permit for the project. <br />5. A two-year guarantee is required for private retention/detention or <br />other drainage treatment/abatement facilities serving areas larger than <br />one acre. <br />6. As-builts of storm sewer, sanitary sewer, and water systems will be <br />required to be submitted per City design and construction standards <br />and specifications. <br />7. The Police Department has the following security recommendations: <br />a. The perimeter doors should be solid core with 190 degree-220 <br />degree wide angle viewers and single cylinder deadbolts with 1" <br />throw and at least 3" screws securing striker plate. <br />b. Lighting of the parking lot should be a minimum of 1-2 foot <br />candles. <br />C. During the final stages of construction, please contact <br />Dick Thornberry, Crime Prevention Officer at 259-0416 for further <br />security recommendations. <br />8. The requisite indemnification agreements must be executed prior to <br />issuance of final Boundary Line Adjustment approval. <br />9. Phase I of the project may effect the assessments for the 60th St. <br />S.W./Hardeson Road L.I.D. No. 726. <br />2991C <br />