My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 75TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1525
>
BASE FILE
>
1525 75TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 2:48:55 PM
Creation date
4/18/2017 12:59:05 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. STRUCTURAL MASONRY: During preparation of masonry wall prisms, <br />sampling and placing of all masonry snits, placement of reinforce- <br />ment, inspection of grout space, immediately prior to closing of <br />cleanouts and during all grouting operations. Where the f'm is <br />less than 2600 psi and special insoection stresses are used, test <br />specimens may consist of either one prism for each 5000 square <br />feet of wall area or a series of tests based on both grout and <br />mortar for the first three consecutive days and each third day <br />thereafter. <br />7. REINFORCED GYPSU`! CONCRETE: When cast -in -place Class "8" gypsum <br />concrete is being mixed or placed. <br />8. INSULATING CONCRETE FILL: During the application of insulating <br />concrete fill when used as part of a structural system. <br />r7 9. SPRAYED -ON FIREPROOFING: As required by Uniform Building Code <br />Standard No. 43-8. <br />10. PILING, DRILLED PIERS ANO CAISSONS: During hiving and testing <br />of piles and construction of cast -in -place drilled piles or caissons. <br />See Item Nos. 1 and 3 for concrete and reinforcing s'eel inspections. <br />1511. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, excava- <br />tions, grading and filling operations to satisfy the requirements <br />of Chapters 29 and 70 (Appendix) of the Uniform Building Code. <br />12. SPECIAL CASES: <br />All inspection reports musk be filed promptly with the Building Department as <br />the work progresses and at the completion of the project, Upon completion of <br />the special inspections a letter or other certification shall be filed with <br />the City of Everett Building Department listing each type of inspection and <br />stating that the special inspections required were completed in accordance <br />with the Uniform Building Code, 4-97-9 Edition. <br />19ef <br />Confirmation of the authority to provide special inspections should be <br />obtained from the owner or his/her authorized agent. <br />Very truly yours, <br />L. N. Callahan <br />Building Director <br />City of Everett <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.