Laserfiche WebLink
AaplrtFor <br />4:77 PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Sbeet <br />Everett, WA 98201 (425) 257-8810 <br />Date 4-14—i9 <br />Public Works Permit N <br />Building Permit R 62166__ <br />TYPE OR PRINT ONLY pn T M } a 1 ?�01 Da <br />J { ll DTI N G _ _ Publ:^ Works Fee $ _,3S <br />Everett Technical Park 101 Elliott `ve W I133J Seattle 98119 206 281-8700 <br />Owner Mailing Address G Zip Phone <br />TCI of Washington Contact: Sabey Corp Haynes Lund 206 281-8700 <br />ApplicantMailing Address City Zip F'iono <br />Describe Proposed Work site improvements _ _ 1 U <br />PROJECT ADDIIESS (if known) _ 1525 75th St SW <br />Attach four (4) copies plans for proposed work - Draw to scale and note the following it applicable O <br />• Property Lines • Outline and dimensions of all existing and proposed structures on the lot • Existing and proposed utilities Milli <br />• Centedmo of street • Indicate North • Show any proposed grading changes • Show measurements <br />DO NOT WRITE BELOW THIS LINE z <br />PERMIT CONDITIONS: O <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. FJ work shall be performed in accordance with this permit and curtail' City of Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-600-424.5555. (n <br />�. Crvii sl'Ve Gtl.-I- - 6a Be n6r)CpZr O <br />�L9n '?Apt -O✓Fa on 5-11-99 (�el°l'l q#-C( 4ed) am <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The unders,gned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages. costs, expenses, or <br />Causes of action that may anso because of Installation and maintenance of the <br />improvement or other right -of way use hereto applied for and further agrees to <br />romove same upon notice from the City and to replace public property dam- <br />aged thereby. <br />signature of Applicainln e <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 100 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />00"PLETION THIS PERMIT MAY 11E CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />