Laserfiche WebLink
SABLA Y <br />(: 111'ORA IION <br />June 16,1999 n���Om� [0) <br />Tony Lee �W�! <br />Associate Engineer JUN 2 2 1999 <br />Public Works — Building Division <br />City of Everett ...................... ............ <br />.............__.... <br />3200 Cedar Street CITY OF EVERETT <br />Everett, WA 98201 Enpingelln9lPubllc SMIC011 <br />RE: Tenant Improvement for TO of Washington at Everett Technical Park III <br />1525 75h Street SW <br />Plan Chock No. B-61945 <br />Dear Tony: <br />The Building Permit application listed above has been approved by the City of Everett and construction is <br />underway. Your office has also approved Temporary Occupancy for a portion of the space covered by that permit <br />(#162 Inventory Warehouse, #163 Exit Enclosure, #164 Supervisor, #166 Supervisor, #167 Converter Repair, <br />#176 Toilet, #179 Vestibule). We are writing now to request a slight expansion of the area of Temporary <br />Occupancy. <br />The tenant has found that they need to use a portion of Room #168, Converter Warehouse in order to operate <br />efficiently. The attached plan shows the portion of this space to be occupied by the Tenant. They will install a <br />rack storage system as shown and will utilize the space for warehouse purposes. This room is fully finished, <br />including the ventilation and sprinkler systems. The only item remaining to be completed is the tie-in of the new <br />fire alarm system; however, the existing alarm system is still functional. <br />This additional area of occupancy does not Increase the number of employees In the building. This area will be <br />used by a single employee with a fork fft who will be in and out of the space picking up and delivering parts and <br />equipn+ent to the assembly personnel in Room #167. <br />The Tenant would like to begin utilizing this area as soon as possible. Since the project is on schedule to be <br />completed by 7/15/99, this early occupancy will last for less than one month. <br />We hope that you will find this proposa: to be acceptable. Please contact me if you have any questions or require <br />any further information. We appreciate your prompt attention to this matter. <br />Sincerely, <br />Haynes Lund, AIA <br />Project Manager <br />Sabey Corporation Architecture Group <br />CC: lily , I )avr 1 M I lawn. Cawy. Stutrl. Iwng <br />_-rIr (] <br />CITY OF EVERETT <br />FiEffi <br />REVIEWEDF OR <br />�w /l�l <br />E M-20EVEREMCFEVRTI6MY DOC <br />architecture • construction . development • management <br />101 1 Avenue %V.. Suite 330 • Seattle, WA. 98119-4220. 2M281-8700 • Faa: 2011262-9951 <br />