My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1615 75TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1615
>
BASE FILE
>
1615 75TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 7:34:41 AM
Creation date
4/18/2017 1:05:20 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1615
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br />UTILITIES DIVISION <br />3200 CEDAR STREET <br />EVERETT, WA 98201 <br />(206) 259-8821 <br />COST ESTIMATE SHEET <br />Receipt*_______________ Date Paid /fl�1 5,�d 6 <br />-_-- Cost of Work Order ;------------ Work Order* <br />------------------ <br />__-_ Cost of Service Order $_ 3178i00 __-_ Service Order* 5 oz gu---- <br />Requested by_______ Gordon Witcher -- _ -- - _____Date of Request_ -10-2-86 <br />--I--------------- <br />Charge Cost to (Name) --- p£CiSe�_S/]1tGll ��---------------------------- <br />Address------------------ - ----------------2----------p-,---C----- <br />City--------------------- `��`+1`l---- State -A _ zip--- CEF�Q (---- <br />Installation Location Boeing site_(12 acre)-we-of6- <br />------ ------------- <br />Installation type/description/size/etc. 3 domestic service <br />------------------------------------ <br />The following estimate is based upon the Utilities Divison providing all <br />labor, equipment, materials, restoration, and final hook-up. _A_double check <br />valve assemb_y for temporary service is available from the city's_Permit <br />Counter by_ requesting a Hydrant Use Permit with an additional deposit. <br />Whenever the estimated cost is not sufficient to cover the total expense for <br />labor, material, equipment rental and administrative costs, the deficit shall <br />be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to <br />the person applying for the installation. <br />Itemized Cost Estimate: <br />Labor & Overhead_______-822.00 --------------- cc: Larry Callahan <br />Material --------------- 2256.00--------- Don Weitkamp <br />Equipment Rental ........ 100.00 Larry Crawford <br />Surface Restoration-------------------------- Bob Chervenell <br />TOTAL (Intl. Service Order cost)__ 3178.00 Clair Olivers <br />Prepared by___ OD._ -Wahl �_ G3J_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.