My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1620 75TH ST SW ALPINE CLEANING AND RESTORATION 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1620
>
ALPINE CLEANING AND RESTORATION
>
1620 75TH ST SW ALPINE CLEANING AND RESTORATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 8:31:55 AM
Creation date
4/18/2017 1:07:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1620
Tenant Name
ALPINE CLEANING AND RESTORATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />APPLICABLE CONDITIONS FROM SW EVERETT MITIGATION DECISION <br />DOCUMENT <br />As stated above, the applicant has agreed to comply with the SW Everett Subarea Plan <br />Mitigation Decision Document. The following are conditions from that document that apply <br />specifically to the subject proposal. <br />Section 2: TRANSPORTATION <br />1. Transit routes/schedules and high occupancy vehicle information must be prominently <br />displayed for employees at on -site commute information centers and near associated <br />walkways. Preferential parking space locations for carpools and vanpools must be <br />provided on all sites. Buildings must incorporate bicycle and pedestrian amenities <br />such as lockers, shower rooms, and bicycle stands. (SEPA Transportation and Land <br />and Shoreline Use Policies) <br />Section 7.2 TOXIC/HAZARDOUS MATERIALS AND EXPLOSIVES <br />Construction Phase <br />11. Construction equipment and vehicles must be maintained so they do not leak fuels or <br />lubricants. During construction, a staging area must be specified for all vehicle <br />maintenance activities. The staging area must be located well away from all drainage <br />courses. Where possible, all stormwater from related maintenance areas must be <br />directed to the sanitary sewer, rather than the stormwater system. (SEPA Earth, <br />Water and Environmental Health Policies) <br />12. During construction activities, all spills of fuel and hazardous materials must be <br />contained and removed in such a manner as to prevent their entering the waters and <br />soils of the State. Cleanup of spills must take precedence over other work on site. <br />(SEPA Earth, Water and Environmental Health Policies) <br />13. During construction, all petroleum products, chemicals, and building materials that <br />could contaminate runoff must be stored in a lined covered area. An impervious berm <br />must be constructed around the perimeter of the storage area. The storage area must be <br />located away from environmentally sensitive areas. (SEPA Earth, Water and <br />Environmental Health Policies) <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.