Laserfiche WebLink
cs�v .4vo,�s'sl' /H z o <br />April 30, 1982 / 126✓yJ 7V LpT �c <br />O'Donnell -Brigham <br />9725 S.E. 36th 0304 <br />Mercer island, WA <br />do Partners/Northwest <br />98040 <br />Subjects Clarification of Addresses to Paine Field Industrial Center <br />Gentlemen: <br />Building q9 ons Lot 2 <br />That portion of the East half of the Southwest quarter of the Northeast <br />quarter of Section i I, Township 28 Nortli, Range 4 East, W.M., lying <br />Southerly of 75th Street Southwest and Westerly o1 16th Avenue West more <br />particularly described as follows: <br />Codnmencing at the Southwest corner of &aid subdivision; thence South 89 32130" Fast 284.00 feet along the South line of said subdivision to <br />the True Point of Be lnnin thence continuing along said South line <br />South 89 2' " _ast 4 .1 feet to the West margin of said 16th Avenue <br />West; thence North 0 46132" West 151.96 feet along said margin; thence <br />Westerly 47.37 feet along the arc of a curvy to the left having a radius <br />of 30.00feet, through a central angle of 90 28109" to a point on the <br />South margin of said 75th Street Southwest; tbience South 88°45'19" West <br />219.29 feet along said margin; thence south I 14'41" Fast 174.83 feet <br />to the True Point of Beginning <br />will be 1620 - 75th St. S.W. <br />It appears that you are now using this address. Therefore, It should present <br />no problem to you. <br />Please feel free to call on us if we can be of any additional assistance at 259- <br />8811. <br />Sincerely, <br />ALFRED R. THEAL <br />Public Works Director <br />By: Kirk Brooks <br />Records Supervisor <br />KB:mh <br />cc: Postmaster, Everett, WA <br />Chief Deputy, Auditor's Office <br />County Engineer <br />Chief of Everett Fire Dept. <br />Chief of Everett Police Dept. <br />Building Inspection Div. <br />Finance h Budget, Utility Billing Section <br />N <br />i <br />_.J <br />