My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1620 75TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1620
>
BASE FILE
>
1620 75TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 8:39:23 AM
Creation date
4/18/2017 1:08:25 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1620
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOLL <br />March 15, 1982 <br />The City of Everett <br />Department of Public Works <br />3200 Cedar Street <br />Everett, Washington 98201 <br />Attn: Mr. Larry Crawford <br />RE: Paine Field Industrial Center (Job #0408) <br />Certificates of Occupancy <br />iS _jnc, <br />Dear Mr. Crawford: <br />As we had discussed recently, The Koll Company is actively pursuing the <br />closeout and completion of the above referenced project. We have been <br />delayed considerably due to weather conditions this winter and have been <br />unable to complete paving, curbing, striping, and landscaping. Four of <br />the six buildings are complete and ready for inspection for certificates <br />of occupancy, and we have requested that the city start the process. In <br />order to finalize this, we need your assistance. <br />The City of Everett presently has a $10,000 check from The Koll Company <br />submitted for work across 16th Avenue West in lice of an assignment of <br />savings account. This was to assure completion of this work and to assure <br />that the street was returned in a condition satisfactory to the city. This <br />work is complete and repair work to a section of asphalt pavement as re- <br />quested recently, is currently under way. <br />We respectfully ask that this mr ey not be returned immediately, and used <br />instead as a cash bond to guarentee The Koll Company's commiti-nent to <br />complete all landscaping, paving, striping and curbing for this project <br />as required per the city approved plans. We intend to finish this work <br />in a fast -track fashion when the weather permits. (Hopefully this will be <br />within about four weeks time). <br />We hope this will satisfy your requirements as to our intentions and commit- <br />tment and will allow you to sign the certificates of occupancy as soon as <br />possible. <br />2021 152nd Avenue N.L • Hednwnit 'u�.� <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.