Laserfiche WebLink
KOLL <br />March 15, 1982 <br />The City of Everett <br />Department of Public Works <br />3200 Cedar Street <br />Everett, Washington 98201 <br />Attn: Mr. Larry Crawford <br />RE: Paine Field Industrial Center (Job #0408) <br />Certificates of Occupancy <br />iS _jnc, <br />Dear Mr. Crawford: <br />As we had discussed recently, The Koll Company is actively pursuing the <br />closeout and completion of the above referenced project. We have been <br />delayed considerably due to weather conditions this winter and have been <br />unable to complete paving, curbing, striping, and landscaping. Four of <br />the six buildings are complete and ready for inspection for certificates <br />of occupancy, and we have requested that the city start the process. In <br />order to finalize this, we need your assistance. <br />The City of Everett presently has a $10,000 check from The Koll Company <br />submitted for work across 16th Avenue West in lice of an assignment of <br />savings account. This was to assure completion of this work and to assure <br />that the street was returned in a condition satisfactory to the city. This <br />work is complete and repair work to a section of asphalt pavement as re- <br />quested recently, is currently under way. <br />We respectfully ask that this mr ey not be returned immediately, and used <br />instead as a cash bond to guarentee The Koll Company's commiti-nent to <br />complete all landscaping, paving, striping and curbing for this project <br />as required per the city approved plans. We intend to finish this work <br />in a fast -track fashion when the weather permits. (Hopefully this will be <br />within about four weeks time). <br />We hope this will satisfy your requirements as to our intentions and commit- <br />tment and will allow you to sign the certificates of occupancy as soon as <br />possible. <br />2021 152nd Avenue N.L • Hednwnit 'u�.� <br />J <br />