My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1720 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1720
>
1720 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 9:01:00 AM
Creation date
4/18/2017 1:10:04 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KQLL <br />March 15, 1982 <br />The City of Everett <br />Department of Public Works <br />3200 Cedar Street <br />Everett, Washington 98201 <br />Attn: Mr. Larry Crawford <br />////� <br />;VJ <br />RE: Paine Field Industrial Center (Job #0408) <br />Certificates of Occupancy <br />,; 5 — <br />Dear Mr. Crawford: <br />('>> Eli IIWre <br />mr°•.R 15 1982 <br />•ITY 0-r (VCRF.TT <br />:11 ! . e�, r <br />As we had discussed recently, The Koll Company is actively pursuing the <br />closeout and completion of the above referenced project. We have been <br />delayed considerably due to weather conditions this winter and have been <br />unable to complete paving, curbing, striping, and landscaping. Four of <br />the six buildings are complete and ready for inspection for certificates <br />of occupancy, and we have requested that the city start the process. In <br />order to finalize this, we need your assistance. <br />The City of Everett presently has a $10,000 check from The Koll Company <br />submitted for work across 16th Avenue West in lieu of an assignment of <br />savings account. This was to assure completion of this work and to assure <br />that the street was returned in a condition satisfactory to the city. This <br />work is complete and repair work to a section of asphalt pavement as re- <br />quested recently, is currently under way. <br />We respectfully ask that this money not be returned immediately, and usEd <br />instead as a cash bond to guarentee The Koll Company's committment to <br />complete all landscaping, paving, striping and curbing for this project <br />as required per the city approved plans. We intend to finish this work <br />in a fast -track fashion when the weather permits. (Hopefully this will be <br />within about four weeks time). <br />We hope this will satisfy your requirements as to our intentions and commit- <br />tment and will allow you to sign the certificates of occupancy as soon as <br />possible. <br />2021 152nd Avenue N.E. 9 Redmond • Washington 98052 • (206) 643.1776 <br />I <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.