My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1721 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1721
>
1721 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 9:05:39 AM
Creation date
4/18/2017 1:10:37 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1721
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />r <br />r <br />L <br />L <br />August 2, 1983 <br />Mr. Joe Shepherd <br />O'Donnell, Brigham 4 Partners/N.W. <br />9725 S.E. 3bth Street, Suite 205 <br />bforcer Island. WA 98040 <br />for Paine <br />Subject: storIndustrial nCenter age gDivision sField <br />I, Division11, <br />Division III, the Boeing Parcel, and Division IV <br />Dear Mr. Shepherd: <br />In rosponse to your inquiry regarding the above stated subject, we would <br />like to clarify the follotdng: <br />e Field <br />1 IndustrialdCentere storainagoDivMonoI and Division IIn requirements rnhavealready <br />been built and moot the City of Everett requirements. <br />2 Paine Field Industrial Center Division III will have no <br />requirement for on -site detention when future development takes <br />place on Division III due to the stormwater pending easement <br />previously granted to the City of Everett under recording <br />18201150113. <br />3. The Boeing parcel has an easement under recording 08103260138 <br />for torm <br />nage line <br />storm - <br />water ndingtcasement 'seeion pond ad s attached ioPaine Field <br />Center exhibit drawing dated February 1982, Job /4006.2). <br />Due to the stormwater ponding casement referred in paragraph <br />/2 above, said detention bond can be eliminated and filled in <br />and that portion of the casement cancelled. <br />4. Paine Field Industrial Center Division 1V does not have Posi- <br />tive flow to the stormwater pending easement at raino Field <br />Industrial Center Division III and therefore its needfor <br />on- <br />site detention will be addressed separately when application <br />for future development is made. <br />Sincerely, <br />AURLD A. TIMAL, P.E. <br />Publin Wsrks Director/city Engineer <br />g ( Dan Ma hias <br />Assistant Engineer <br />DM:mii <br />I <br />J <br />L <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.