My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1802
>
1802 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 11:50:17 AM
Creation date
4/18/2017 1:23:16 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1902
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44VA QYW <br />r <br />2i <br />July 13, 1978 <br />Mr. Charles A. Lang <br />Public Utility District CITY OF <br />P.O. Box 1107 <br />Everett, WA 98206 everett <br />SUBJECT: Permit Number 78-187 to clear Public Right -of -Way known as DIN 8 i'• »del ' •'•-°T^^ <br />.IT, WA0 <br />»I»47U» <br />Ave. W. W. O. 890 •..., <br />Dear Chuck, <br />Your application for a permit to clear the public right-of-way has been approved. <br />All work shall be carried out in accordance with the attached permit. <br />Your application for a clearing permit on 12rivate proi&ay (your file #218) is currently <br />in review fc- compliance with the drainage ordinance d concerns the Building <br />Department may have. If you have questions concerning that permit please contact <br />Ken Callahan at 259-8745. <br />Enclosed is a copy of the City rules and regulations governing work within the <br />public rights -of -way. Please call the Engineering Department Construction Division <br />(259-8811) prior to starting this work so that an inspection can be made. <br />This permit is valid for a period of sixty (60) days from date of issue. If for some <br />reason the work has not been started within this period of time, it will be necessary <br />(or you to contact the Engineering Department to request a time extension. <br />Sincerely, <br />LLOYD E. HENNING, P.E. <br />City Engineer <br />By: Celia 1. Strong <br />Public Service Enginee i <br />Enclosures <br />cc: Piel•f Inspector <br />Ken Callahan, Director Building Department ' / _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.