Laserfiche WebLink
DRAIN PLATE <br />A-1 <br />VIEW B•B <br />�PIGAL TQW R CONNECTIONS <br />rq, <br />.'F'L,�. <br />DRY PACK - FOUNDATION <br />DRYPACK DETAIL FOR STANDARD TOWERS OVER 100FEET <br />0 <br />i n <br />SPACER <br />A <br />PIPE DIAGONAL <br />_EG CONNECTIONI <br />TAB PIPE DIAGONAL <br />0 <br />� e <br />—PIPE DIAGONAL <br />SECTION A•A <br />DRY PACKING PROCEDURES: <br />MIX 2 PARTS SAND, ONE PART CEMENT. <br />AND ADD JUST ENOUGH WATER TO ALLOW <br />MOLDING A SHAPE BY HAND. RESTRICT <br />THE WATE" :ONTENT TO A MINIMUM. <br />(THIS MINI!o.ZES THE POSSIBILITY <br />OF SHRINKAGE WHENTHE MORTAR, DRY• <br />MIXEDFOR MAXIMUM DENSITY AND <br />STRENGTH, IS PACKED IN PLACE.) THE <br />PACKING SHALL BE DONE BY HAND, <br />RAMMING WITH BARS OR CALKING TOOLS. <br />OR A COMBINATION THEREOF. <br />I <br />