My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 75TH ST SW 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
2320
>
2320 75TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 12:17:19 PM
Creation date
4/18/2017 1:28:03 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
2320
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions: <br />a 1) Carefully review the requirements of each or the of tions below. Choose an option that best suits your <br />dwelling design Glazing percentage typically doterm nos which option to choose. Your building must match <br />the selected Option requirements without exceptions or substitutions. <br />2) In the shaded areas on the pages that follow, make checks in the circles next to the requirements of your <br />Opficn (the Option numbers are in paretheses next to the choices). Disregard components or equipment that <br />don't apply to your project. Your permit will he processed more efficiently if you provide all of the requested <br />information. r)epartment staff can help you with general questions about this form. <br />Can't comply? If none of the Chapter 6 Options are acceptable, consider the Chapter 5, Component <br />Performance, Approach. The main advantage is flexibility to juggle individual R and U-values as long as a n <br />overall maximum value isn't exceeded. Note that the overe.'I thermal requirements of Chapter F are no IrsL <br />stringent than Chapter 6. Calculations may be performed with a Chapter 5, Component Performance <br />VVorksheot, or by using an acceptable -,omputer program such as WATTSUN.5.1. <br />Plan Review <br />(For official use c fy) <br />Selected Option is <br />appropriate for this <br />dwelling design. <br />YES <br />No nn <br />Option— may be a <br />better choice. <br />Notes: _ <br />1%IES?IORr..15EPTE1.IBER 199% <br />HVAC AFUE <br />Glazing max: <br />of floor <br />U-Value <br />Door U-value 2 <br />(R-value) <br />Ceilings: <br />with attics <br />vaulted <br />Walls: <br />above grade <br />below grade <br />interior <br />or exterior <br />= Floor <br />Slab on grade <br />OPT I <br />OPT II <br />OPT III <br />0 <br />0 <br />0 <br />2--.78 <br />I .78 <br />I a.88 <br />10% <br />1294 <br />21% <br />0.70 <br />0.65 <br />( 0.75 <br />0.40 ' 0.40 0.40 <br />(R•2.5) I (R-2.5) (R•2.5) <br />R-30 I R-30 I R-30 <br />R-30 R-30 R-30 <br />R-15 I R-15 I R-19 <br />R-15 <br />R-15 <br />R-10 <br />R-10 <br />R-19 <br />R-19 <br />R•10 <br />R-10 <br />OPT IV <br />OPT V <br />0 <br />P OT VI <br />(S 2 Sbi95f <br />010 <br />OPT VII <br />(S 2 SIUYIaS, <br />:.78 <br />z .74 <br />- .78 <br />a .78 <br />-'1% <br />21% <br />25% <br />3DY. <br />0.65 <br />0.60 <br />0.50 <br />0.45 <br />0.40 <br />0.40 <br />0.40 <br />0.40 <br />(R-2.5) <br />(R-2.5) <br />(R-2.5) <br />(R-2.5) <br />R-30 R-30 R-38 <br />R-30 R-30 R-30 <br />R-19 I R-19 R-19 <br />R-19 R-19 I R-19 R-19 <br />h D R-10 R-10 R-10 <br />R-19 <br />R-19 <br />R-19 <br />R-25 <br />R-10 <br />R-10 <br />R-10 <br />R-10 <br />Footnotes: <br />1) The "? " symbol means "bore Iran or equal to";"," means "less than or equal to". <br />2) Glazing L door U.vaiuoe may Eo weighted If they don't exceed the Option U-valuo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.