Laserfiche WebLink
INSPECTION REPORT <br /> LAddress lal , l h <br /> r <br /> Contractor— 1e_+_00__ - <br /> Ir <br /> Owner <br /> Date <br /> Pp J PARTIAL APPROVAL <br /> ITA ON J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE uefore work can be approved. <br /> J Please contact inspector and arrange for appointmenl. <br /> J Was not able to perform inspection. <br /> J CALL 259-8819 FOR REINSPECTION-24 our notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> f <br /> 1 <br /> I lC / < <br /> Inspector � <br /> _� Date CL.f�2� <br /> TYPE OF INSPECTION REQUESTED <br /> J Temp. Elecl. J Framing �as Piping <br /> U Footing J Drywall,Nailing J Consultation <br /> J Foundation J Shear Nailing J Groundwork <br /> U Ductwork J Grid J•SLruct.Slab <br /> U Wood Stove J Rough-in anal <br /> 0 Masonry J Service J Insulation <br /> U Other <br /> U BLDG:Pmt.No. J MECH:Pmt.No. <br /> U ELEC:Pmt. No. J PLBG:Pmt.No. <br />