My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2108 62ND ST SE A,B 2018-01-02 MF Import
>
Address Records
>
62ND ST SE
>
2108
>
2108 62ND ST SE A,B 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 2:33:36 PM
Creation date
4/18/2017 8:51:08 AM
Metadata
Fields
Template:
Address Document
Street Name
62ND ST SE
Street Number
2108
Unit
A,B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601. <br />0 Connect side sewer per City Standard #'a 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench Is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. <br />10. Install erosion control measures as determined by the Public Works Inspector, such as sill fence, straw <br />bales, swales, or erosion blankets. <br />11. Install erosion control measures per City of Everett Standards for small parcels <br />12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allowed on this building lot. <br />14. No dirt, mud, rocks or debris to be tracked onto roadway. <br />15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as f or City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />19. Pave driveway from the front property fine out to the street paving. <br />20. Contact the Water District for connecting provisions for this building's water and <br />sewer services. <br />21. A catch basin as per City Standard Plan #402 with a gas trap pe• Standard Plan #410 is required for the <br />parking area. <br />22. If a sewer pump system Is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />23. A sprinkler system Is required for this building in compliance with the requirements of NFDA Standards <br />13D. <br />Pwcamenls <br />
The URL can be used to link to this page
Your browser does not support the video tag.