Laserfiche WebLink
INSPECTION REPORT <br />Date:Permit:. <br />r� <br />Contractor: <br />Owner: <br />77���� <br />,�d /"a S`�- -- <br />Site Address: <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING MECHANICAL PLUMBING <br />❑ LIFER ground ❑ Groundwork/Stab GroundworkiStab <br />(] Temp Service <br />Groundwork <br />[]Footing [] Rough In ❑ Rough In <br />[] Ceiling GNEl : <br />[] Slab/Conduit <br />❑ Foundation ❑ Ceiling Grid <br />(] Structural Slab ❑ OK to Insulate ❑ OK to insulate <br />Rough In <br />❑ Service <br />❑ Framing [] Rooftop Units ❑ Water Service <br />L1 Medical Gas <br />(] Grounding <br />[]Insulation ❑ Mechanical Final <br />Plumbl g Final <br />El Ceiling Grid <br />❑ Drywall Nailing r' <br />Electrical Final <br />SITE WORK <br />C] Shear Nailing GAS PIPE <br />❑ Roof Nailing ❑ Rough InlSarvice Hot Water Tank <br />(] Footing drains <br />❑ Ceiling Grid ❑ Refrigeration ❑ Rough In <br />❑ Building Final [] Gas Pipe Final 1] HWT Final <br />Roof drains <br />OTHER OR CONSULTATION: _ <br />F) APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />[] OK FOR T.0 O. I] CORRECTION REQUESTED ❑ <br />[] OK FOR C.O. [_. VIOLATION <br />(-I UNABLE TO PERFORM INSPECTION. <br />.......—, I.,.nea\ cnci PGINSPECTION - 24 hour notice required <br />Data:-�/---"Y <br />Ingo <br />Cftel: <br />