My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1713 63RD ST SE AB 2018-01-02 MF Import
>
Address Records
>
63RD ST SE
>
1713
>
1713 63RD ST SE AB 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 9:40:45 AM
Creation date
4/18/2017 8:51:16 AM
Metadata
Fields
Template:
Address Document
Street Name
63RD ST SE
Street Number
1713
Unit
AB
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br />PERMIT ilf,/kED) <br />(vfG-1 <br />PUBLIC W0RK!fflfiiRllbAt05047 <br />3200 CTdar Street <br />Evi % Everett. QDG $2rl3A <br />(425)25 <br />C $6.50 <br />1 DRIVE $25.00 <br />OWNFHNA"'TLUE RIDGE CONSTRUCTIOI pr APPLICANT <br />AND ADDRES PO BOX 302 LH AN O ADDR6MD k <br />DWALL WA 1449 5 I SEkER P0.00 <br />7 <br />PHONE: 2068197413 1 GjS DPJ PHONE 11,M4.00 <br />Date 5/31/2006 <br />Pudic Works Permit N PW0605-059 <br />Building Permit N C0605-047 <br />Planning Reference N <br />Public Works Fee $ $25 .00 <br />Guarantee S <br />TO POSTING FEEI 11 1107 <br />TAX PARCEL 10000531700100500 1 TRAFFIC PrIaECTAdIi . 713 i,;;FD ST SE NATE <br />DESCRIPTION OF NEW DUPLEX 7711 tltlUWtt 1.5 <br />PROPOSED WORK. CARD h„ $6,701.53 <br />PERMIT CONDITIONS <br />LOT 3 S51202-09- <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257.8810 <br />2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig TOLL FREE NUMBER 1-800-424-5555 <br />4. Connect side sewer per ''ity StandaoJ Va 601, 602, 604. <br />5. Rooftop runoff must be discharged to a roof downspout infiltration system per City <br />of Everett Storm Manual 3-2.6.2. The approximate size trench 13 3.51 wide, 21 deep <br />and 251 long. See attachment for more details. <br />6. The contractor must meet with the 'Public Works Inspector (Randy, 425-339-7403) <br />discuss potential dLainage routing prior to beginning the project. <br />7. Install erosion control measures per City of Everett Standards for small patcela <br />S. Remove erosion control n.asures upon completion of- the project prior to final <br />approval of the permit. <br />9. All excavated material foal foundation, sidewalk and driveways shall be hauled to <br />an approved, permitted site. No wasting of material is allowed on this building lot. <br />In. No dirt, mud, rocks or debts to be tracked onto roadway. <br />11. No building materials to be stacked on sidewalks and sidewalks to be kept clean <br />and open for pedaatrian travel. <br />12. Adjutit water meter ll I" bbove sidewalk gCA!te. <br />Appro for Construction Dal <br />QFINAL INSVECTICIN <br />Approved as Constructed Dale <br />ACKNOWLEDGEMENT OF CONDITIONS <br />undersigned ownerlapplicant hereby agrees to hold and <br />,ave harmless the City of Everett from any and all claims for <br />damages, costs, expenses. or causes of action that may arise <br />because of Installation and maintenance of the improvement or <br />other right -of way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public <br />property damaged Ihefeby. <br />Signature of ApplicaT--�Dale <br />ag <br />Z <br />O <br />'FL <br />^— <br />vJ <br />0 <br />LL <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.