Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1994 TO 1999 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 8 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC TRAFFIC SIGNALS Resolution No. <br /> P PROJECT IDENTIFICATION I T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> r m o L t FEDERAL FUNDING <br /> i A.PROJECT TITLE p t o i C EXPENDITURE SCHEDULE <br /> C o B.STREET/COUNTY ROAD NAME OR NUMBER r T a n I o PROJECT MONTH/ Federal Federal LOCAL RAP TOTAL (Local Agency) <br /> I r C.TERMINAL BEdINNING AND END o y I g I d PHASE YEAR Cost Fund CAPP FUNDS 4th, <br /> a i N D.DESCRIBE WORK TO BE DONE v p t t e PHASE By Code TIA 1st 2nd 3rd 5th, <br /> s t o .e h y s STARTS Phase UATA 6th, <br /> s y. r OTHER <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 18 17 <br /> 19 1 A.EVERETT AVENUE SIGNAL IMPROVEMENTS 12 00 00 PE 1/93 <br /> B.EVERETT&HOYT,WETMORE,ROCKEFELLER,OAKES,CEDAR 14 R/W 600 600 120 360 <br /> C.EVERETT AVENUE,SR 529 CONST 8/93 <br /> D.INSTALL SIGNAL IMPROVEMENTS AT EVERETT AVE.SIGNALS TOTAL - <br /> 19 2 A.SIGNAL MASTER&INTERCONNECT 12 00 C PE <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS 14 P R/W <br /> C.IBID. T CONST 5/94* 600 600 )00 100 100 300 <br /> D.DESIGN&CONSTRUCT INTERCONNECT;UPGRADE SIG.MASTER TOTAL _ - <br /> 19 3 A.INTERIM TRAFFIC SIGNALS 12 00 00 PE • <br /> B.VARIOUS LOCATIONS WITHIN THE CITY LIMITS 14 R/W 900 900 150 150 300 600 <br /> C.IBID. CONST 3/94 <br /> D.CONSTRUCT INTERIM SIGNALS TOTAL <br /> 19 4 A.SIGNAL INTERCONNECT 12 00 00 PE 1/93 <br /> B.SR 99 14 R/W 5 T-22 27 9 <br /> C.108TH STREET TO AIRPORT ROAD CONST 9/93 <br /> D.INSTALL SIGNAL INTERCONNECT TOTAL <br /> 19 5 A.HES SIGNAL IMPROVEMENT 12 00 C PE <br /> ' B.19TH AVENUE SE AND 110TH STREET SE 14 P R/W 10 103 90 <br /> C.IBID. _ T CONST 10/93 93 STP(H) <br /> D.SIGNAL IMPROVEMENT PROJECT TOTAL 93 <br /> 19 6 A.DEVELOPER SIGNALS12 00 C PE <br /> ' B.MADISON/EVERGREEN;BEVERLY LANE/MADISON;MERRILL CRK./SEA 14 P R/W 7000 7000 500 500 3000 3000 <br /> WAY;SEAWAY/75TH;CASINO/5TH;HARDESON/75TH,80TH,MCPKWY,etc. T CONST 5/94* <br /> D.CONSTRUCT SIGNALS TOTAL <br /> 19 7 A.HES PROJECTS 12 00 00 PE 4/94 <br /> B.41ST STREET OFF-RAMP&BROADWAY;EVERGREEN WAY& 14 R/W 20 310 110 <br /> SOUTH FRED MEYER DRIVEWAY SIGNAL;BROADWAY GUARDRAIL 18 CONST 8/94 280 STP(H)* <br /> D.HAZARD ELIMINATION PROJECTS TOTAL 280 <br /> •A portion or all of the funding for these projects has not yet been committed. <br />