Laserfiche WebLink
Six Year Transportation Improvement Program <br /> Instructions for Preparing Form <br /> Include all proposed projects regardless of location or source of funds. However,Urban or Rural Arterial Trust Fund projects need . <br /> to be included only in Six Year Transportation Programs beginning in odd numbered years. <br /> Complete the form for the six year program in accordance with the following instructions. <br /> Heading <br /> Agency Enter the name of the sponsoring agency AND appropriate county. <br /> County Number Enter the OFM assigned number. <br /> ' <br /> Coy Number Enter the OFM assigned number. <br /> MPO Enter the name of the associated MPO(if applicable). • •. <br /> Hearing Date Enter the date of public hearing on this program. <br /> Adoption Enter the date of action by the counciyconunission. <br /> Resolution No. Enter Legislative Authority resolution number(if applicable). <br /> • <br /> Column Number. <br /> • <br /> 1. Functional Classification.Enter the appropriate two-digit code denoting the Federal Functional Classification. <br /> (Note: The Federal Functional Classification approved through FHWA). <br /> Description • <br /> Rural (under 5,000 area) Urban (over 5,000 area) <br /> 01 Principal Arterial—Interstate 11 Principal Arterial—Interstate <br /> 02 Principal Arterial—Other 12 Principal Arterial—Expressway • <br /> 06 Minor Arterial 14 Principal Arterial Other <br /> 07 Major Collector 16 Minor Arterial <br /> 08 Minor Collector 17 Collector <br /> • • 09 Local Access 19 Local Access <br /> 00 ' No Classification Applicable <br /> • 2. Priority Number. Enter local agency number identifying agency project priority(optional). • <br /> 3. Protect Identification. Enter(a)project title(include federal project number if previously assigned;(b)street/road ' <br /> name or number;(c)beginning and ending termini(mile posts or street names);and(d)briefly described the work to be • <br /> completed. • <br /> 4. Improvement Type Codes. Enter the appropriate code number(s). • <br /> 01 New construction on new alignment 13 Environmentally related -• • <br /> 02 Reconstruction(added capacity) • 14 Intersection improvement <br /> 03 .Reconstruction(no added capacity) 15 Rail highway crossing <br /> • 04 Resurfacing/restoration/,ehabilhation 16 Guardrail <br /> 05 Paths,trails,sidewalks 17 Other/safety/roadside/raffc oper ke <br /> 06 Other enhancements 18 Carpool,vanpool <br /> 08 New bridge 21 Transit capital project <br /> 09 Bridge replacement 22 Transit operational project . • <br /> • 10 • Bridge rehabilitation 23 Transit planning <br /> II Other bridge work 24 Transit training/administration ' <br /> 12 SafetyAraffic operations/ISM 31 Non capital improvement <br /> • <br /> 32 Non motor vehicle project • <br /> 5. Total Length. Enter project length to the nearest hundredth mile(or code"00"if not applicable). <br /> . 6. Utility Codes. Enter the appropriate code letter(s)for the utilities that would need to be relocated or are impacted by • <br /> • the proposed proceed construction of the project. <br /> C cable TV S Sewers(other than agency owned) <br /> ' G Gas T Telephone . <br /> P Power W Water <br /> 0 Other <br /> 7. Project Phase. Project cost in thousands is to be entered by phase. • <br /> PE Preliminary engineering only(or planning) . <br /> R/W Right of way or land acquisition only(9r equipment purchase) <br /> Coast Construction only(or transit operating) - <br /> Total Total of phases(or enter total only if all will be authorized in one fiscal year). • <br /> 8. Month/Year Phase Starts. Enter the month/year the project phase will begin'or FTA obligation is expected, <br /> 9. Cost. Enter the federal cost(in thousands)of the phase for the fond source regardless of when funds will be <br /> expended. <br /> • <br /> 10. Funding by Source Code. Enter the code from the table. • <br /> • <br /> BR Bridge Replacement/Rehab. NHS National Highway System • <br /> . CMAQ Congestion Mitigation and Air Quality S16 PTA Elderly and Disabled Persons <br /> DEMO ISTEA Demo Projects S18 FTA Rural Areas • <br /> DISCR ISTEA Discretionalry Projects S3 FTA Distretionary for Capital Expenditures <br /> DDD Department of Defense Funds S9 FTA Urban Areas <br /> IR Emergency Relief Si?(E) Transportation Enhancements • <br /> ELHP Federal Lands Highway STP(H) Ilaard Elimination • <br /> IC Interstate Construction ST(RRP) RJR Crossing Improvements <br /> IM Interstate Maintenance Si? Other <br /> 11. Local Agency Funds (in thousands) From Any Source. <br /> 12. Funds by State or Other Source(use codes for predominant source followed by costs in thousands)._ . <br /> C CAPP U UATA <br /> T 11A 0 Other <br /> R RAP <br /> 13. Total Funds. Enter the Sum of Columns 9.11.and 12. <br /> • 14-17. Expenditure Schedule—(1st,2nd,3rd,4th thru 6th years). Enter the estimated expenditures in thousands <br /> of dollars by year.This data is for local agency use. <br /> DOT 14o449tnstunions <br /> I <br /> • <br />