Laserfiche WebLink
witir <br /> CITY OF EVERETT <br /> 1994 TO 1999 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN (TIP) <br /> Principal Arterials 6. Neighborhood Traffic Mitigation <br /> Projects <br /> 1. Alverson Bridge 7. Boeing Mitigation Park & Ride <br /> 2. SR 526/I-5 Interchange Lot Projects <br /> 3. Paine Field Blvd./SR 525 8. Pedestrian Improvements <br /> 4. EB SR 526 to SB I-5 HOV Lane 9. Neighborhood Block Grant <br /> 5. 19th Avenue SE 10. Pavement Markings <br /> 6. E. Marine View Dr. 11. Roadway Hazard Elimination <br /> 7. Evergreen Way (75th - SR 526) 12. Neighborhood Traffic Studies <br /> 8. Evergreen Way (75th - Madison) 13 . City Entryway Landscaping and <br /> 9. Evergreen Way (Madison - 52nd) Signs <br /> 10. W. Marine View Dr. <br /> 11. SR 526/Evergreen/Casino Traffic Signals <br /> 12. SR 525 HOV Lanes <br /> 13 . Everett Avenue/SR 2 On-ramp 1. Everett Avenue Signals <br /> Study 2. Signal Master & Interconnects <br /> 14. I-5/12th Street NE Interchange 3. Interim Traffic Signals <br /> Study 4. Signal Interconnect (SR 99) <br /> 15. Paine Field Blvd. Extension 5. HES Signal <br /> Study 6. Developer Signals <br /> 16. Mukilteo Blvd./41st Street 7. HES Projects <br /> Corridor and Pedestrian Study <br /> 17. 41st Street Interchange/Ramps Transportation-related Projects <br /> 18. 41st Street <br /> 1. Innovative Employer Programs <br /> Minor Arterials 2. Increased Rideshare Subsidies <br /> 1. 112th Street Transit Improvements <br /> 2. Madison Street <br /> 3. 4th Avenue West 1. Transit Operating Assistance <br /> 4. 100th Street SE 2. Paratransit Vehicle Replacement <br /> 5. Seaway Boulevard 3 . Bus Replacement <br /> 4. Paratransit Computer <br /> Collector Arterials Scheduling/Routing <br /> New Buses (Expansion) <br /> 1. 75th Street 6. Paratransit Vehicles <br /> 2. 7th Avenue SE Study (Expansion) <br /> 7. Transit Facility Improvements <br /> Vicinity Improvements 8. Regional Pass System Planning <br /> 9. Security Equipment <br /> 1. Annual Street Overlays 10. Bus Stop Improvements <br /> 2. Regional Trail System 11. Bike Racks/Lockers <br /> 3. Community Trail System 12. SR 99/Evergreen Way/Rucker Ave. <br /> 4. Neighborhood Trail System Transit Priority Project <br /> 5. Neighborhood Mitigation Signal <br /> Projects <br /> RptlNG <br /> � <br /> MICHIERM <br /> CENTO1893.1993I <br /> sy4p/NG ou <br />