My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
319 76TH PL SW 2016-01-01 MF Import
>
Address Records
>
76TH PL SW
>
319
>
319 76TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 10:32:12 AM
Creation date
4/18/2017 10:31:50 AM
Metadata
Fields
Template:
Address Document
Street Name
76TH PL SW
Street Number
319
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br /> UBi/C wo/a C 9 <br /> ENGINEERING/PUBLIC SERVICES DEPARTMENT <br /> December 27, 2001 <br /> Eric Sladky <br /> PB Architects <br /> 303 Battery Street <br /> Seattle, WA 98121 <br /> RE: Owner: City of Everett <br /> Job Address: 319 - 76" Street SW <br /> Plan Check No: B0112-029 <br /> Dear Mr. Sladky: <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issues only, additional revisions or additions may be required by other <br /> departments (such as Utilities. Planning or Fire). All referencev refer to the 1997 Uniform <br /> Building Code, as amended by the State of Washington and/or Washington Stale Energy Code <br /> 2001 Edition, unless stated otherwise. <br /> The construction documents that were submitt-d with the application would be adequate for a <br /> building permit for construction of miscellaneous footings and details only. Two complete sets <br /> of construction documents are still required for the tower and prefabricated building. <br /> Upin resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br /> the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> � <br /> Steve Miller <br /> Associate Engineer <br /> OEMINMISM ILLERW I IS t2l 111$-'IT11 ST SM, <br /> CITY OF EVERETT • 3230 Cedar Street • Everett, WA 98201 9 (425) 257.8800• Fax(425)257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.