Laserfiche WebLink
PUBLIC WORKS Date 5/29/01 � <br /> PERMIT Public Works Permit N PWO 105-04 3 <br /> Building Permit C0105-026 <br /> PUBLIC WORKS DEPARTMENT Planning Reference It <br /> OLT 3200 Cedar Street <br /> Everett,WA 98201 Public.Works Fee$ $25. 00 <br /> (425)257.8610 JAN 0 7 2002 Guarantee$ <br /> TO POSTING <br /> AND OWNER NAME ROSE HOMES INC ANDADOESS: ROSE HOMES INC <br /> OWNERANT NAME <br /> KESS: <br /> 11706 MARINE DR 11706 MARINE DR <br /> MARYSVILLE WA 98271 MARYSVILLE WA 98271 <br /> PHONE: (260)652-7591 PHONE: (260)652-7591 <br /> TAX PARCEL 40 0091.67000001000 PROJECTAODRESS: 8 76TH PL SW <br /> DESCRIPTIONOF NEW HOUSE v <br /> PROPOSED WORK: <br /> PW <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance-phone(425)257-8810 <br /> 2. All work shall be performed In accordance with this permit and current City of Everett Design and Conslnlction <br /> Standards and Specifications. <br /> 3. Call Location Underground Service 48 firs.before you dig. TOLL FREE NUMBER 1-800-424-5555 <br /> 4 . Install side sewer up to building pet City oT Everett Standard 4601 . W <br /> Iiiun <br /> M <br /> 07-25-01 12:02P4 0 <br /> 0 1050226 003 <br /> BUILD 551.75 <br /> ERCHG 4.50 Z <br /> PLUMS 98.00 <br /> DRIVE 25.00 <br /> f1ECH 60.00 <br /> 14 107031 Cn <br /> SEWER 70.00 O <br /> UTILITY 1296.00 <br /> WATER 130.00 a <br /> 2635.25 <br /> CIt�1; o3S.25 <br /> ^.r <br /> ACKNOWLEDGEMENT OF COND17IONS <br /> The undersigned ownerhpplicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims fon <br /> l rf Co�trudion Date damages,costs,expenses,or causes of action that may aGso <br /> because of Installation and maintenance of the improvement or <br /> r other right-ol-way use hereto applied for and further agrees to <br /> remove samo upon notice from the City and to replace public <br /> FINAL INSPECTION f propony damaged thereby <br /> Approved as Constructed Data 7 <br /> - -- <br /> n gra of Applcant Dale Dale <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILICENTLY PURSUED <br /> TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE CITY U.°UN ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />