Laserfiche WebLink
A COMMITMENT FHA CASE N0. 561s294860-221 <br /> 2 ADDRESS 14 - 76th. Street S.W. _ <br /> �6- Everett, Washington 982ni <br /> ;ommitment conditions (applicable when checked) <br /> A required repairs must be completed in a professional manner. <br /> ,/'All certifications and/or pest control certificates of completion must be submitted before <br /> requesting final inspection of repairs. Note: If VC-15 is required, it is recommended <br /> " this certificate be obtained before any other certifications are obtained and any repair <br /> / work commenced. <br /> J-11 0 If property is sold under Section 221(d)(2) a certificate of compliance with the <br /> minimum housing code will be required prior to request for inspection of other addendum <br /> requirements. If there are no addendum requirements, the certificate may be submitted <br /> with closing documents. <br /> -12 fl Submit certification from the local authority having Jurisdiction that the subject <br /> property is in compliance with the Local Minimum Housing Code. <br /> I <br /> C-13x] Submit certification from a state licensed pest control operator that wood destroying <br /> organisms, fungus and/or rot damage in all of the dwelling, interior and exterior, have <br /> been eliminated. Attach list of any repairs or corrections completed in connection <br /> with above certification. A "Standard Notice of Work Completed" or a report form <br /> indicating no infestation may be submitted as certification. Note: All repairs must <br /> be completed in a professional manner and in compliance with local building codes. <br /> C-14 0 0 (a) This commitment is subject to receipt of clear certificate(s) for (electrical, <br /> plumbing, roofing, and heating). The required certificate(s) is (are) being ordered <br /> and will be paid for by HUD. Cost of additional certificates or required repairs shall <br /> be borne by the Seller. <br /> 0 (b) Reinspection to examine the following system(s) not in operation at the time <br /> of our appraisal is required. Please notify this office in writing when ready for <br /> inspection: <br /> Q plumbing 0 heating 0 electrical <br /> Correction of any deficiencies found is a specific condition of this commitment. <br /> Indicated system(s) shall be operable and inspection completed prior to the request <br /> for conversion to a firm commitment. <br /> C-15 0 Furnish evidence from the local health authority indicating approval of the <br /> L7 individual water supply system, Q individual sewage disposal system. <br /> It is recommended the above evidence of approval be obtained before commencing any <br /> other required repair work. <br /> C-16 U 0 (a) Re-roof IF dwelling and/or IF garage with minimum 235# self sealing compositic <br /> shingles or #1 cedar shingles, and repair sheathing and install new flashings as necesac <br /> Remove all old roofing when two or more layers exist. <br /> 8 (b) Repair roof of 0 dwelling and/or L7 garage to an acceptable condition. <br /> (c) Re-roof built-up roof: After removing all old roofing, install min. 3 ply-hot <br /> mo ed 15# felt roof with flood coat and 400/ gravel per 100 sq. ft. <br /> 27(d) Repair built-up roof: Remove all gravel and counter flashing from roof, clean <br /> surface to accept hot mop. Provide minimum 15 lb. felt, hot mopped and flood coated. <br /> Replace gravel and flashing and properly seal all gutters and apertures. <br /> !C-17 Q Paint all exterior metal and wood trim of Q house and/or L7 garage after adequately <br /> preparing surface. In rooms with openable windows, at least one must be free and operas <br /> IC-18cQ Paint entire exterior of &f house and/or flt garage including trim. Prepare surface <br /> by repairing all damaged and deteriorated areas, remove all loose paint and blisters ano <br /> apply an undercoat to all bare wood. In roans with openable windows, at least one must <br /> be free and operable. <br /> /C-19 0 Remove the existing floor covering in the following rooms: <br /> Replace with new resilient floor covering over suitable underlayment after making <br /> necessary repairs to subfloor. <br /> IC-20 Q Submit statement from purchaser acknowledging wall-to-wall carpet as the finished floor <br /> in the Q kitchen 0 bathroom. <br /> TUMBLE <br /> 3EA Form 1019-Q-113 (Rev. 8-1-75) <br />