Laserfiche WebLink
everett INSPECTION REPORT <br /> eAddress �/ �- 7�0*� S s <br /> Contractor <br /> Owner t r <br /> Date 5 — 3(y <br /> TYPE OF INSPECTION REQUESTED <br /> *LDG: Pmt. No._;�q20CCL❑ MECH: Pmt. No. . <br /> El ELEC: Pmt. No. ❑ PLBG: Pmt. No. <br /> ❑Tomp. Elect. ❑ Framing ❑Gas Piping <br /> Footing ❑ Drywall, Nailing CJ Consultation <br /> ❑ oundation ❑Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑Grid ❑ Struct.Slab <br /> ❑Wood Stove ❑ Rough-In ❑ Final <br /> ❑ sonry ❑Service ❑ <br /> PPROVAL 5 ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact Inspector and arrange for appointment. <br /> ❑ Was not able to perform Inspection. <br /> ❑ CALL 259.8810 FOR REINSPECTION— 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE �R_ ISES PRIOR TO OCCUPANCY. <br /> Inspector _ _,.L Date �,=1 � <br />