Laserfiche WebLink
everett INSPECTION REPORT <br /> Address <br /> --t 7—Z& <br /> Contractor <br /> Owner __-��r <br /> Date 6- 7140 — <br /> TYPE OF INSPECTION REQUESTED <br /> G BLDG: Pmt. No.,�J n MECH: Pmt. No. <br /> n ELEC: Pmt. No. _ I� PLBG: Pmt. No. <br /> ❑ Framing D Gas Piping <br /> D Temp. ct• D Drywall,Nailing D Consultation <br /> D F g ❑Shear Nailing D Groundwork <br /> oundetion D SheGrid D Struct. Slab <br /> D Ductwork p Rough In D Final <br /> ❑Wood Stove D Service D -- <br /> ❑ M rY <br /> PPROVAL S+uilrbj L PARTIAL APPROVAL <br /> El VIOLATION G CORRECTION REQUIRED <br /> El Corrections listed below MUST BE MADE before work can be approved. <br /> D Please contact Inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑ CALL 259.0010 FOR REINSPECTION— 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. j�f <br /> 1 E l O I Cu��Tr 1 �Qs7 L <br /> e s --- -- <br /> 'n — Date <br /> Inspuclor L'1� <br />