Laserfiche WebLink
r '`,i:t We i �"e+�a x.e _. ,� �yrx .. ip.! >a Y, •4.,;,.. <br /> COMPUANC[.. u �e . -• P - ,• I .y-I �,+ B ,. - :r.. <br /> REQUIRED <br /> INSPECTION IMPORTANT:Su I Information In the shaded area b checking theappropriate circles, <br /> APPROVED PP Y y g <br /> Disregard topics that don't descrlbo your building or equipment. DO NOT place checks In <br /> tho two left columns. <br /> FOUNDATIONPHASE <br /> ❑ ❑ r Sleb insutatrOn(Taabie 6.1)shall be,R-10,and located on the: <br /> D A.Exterior(See INSULATION INSPECTION), <br /> OR <br /> 0 B. Interior extending downward from file top slab surface to Its undersudaco and <br /> hcrtzontally under the slab for a total distance of 24,or vertically 24". <br /> ❑ ❑ s Radiant Slab Insulation shall have R-10 and extend under the entire slab(S.502.1.4,9) <br /> ❑ ❑ a Below grade masonry wall Insulation(S.502.1.4.10)shall be full-depth and located on the: <br /> 0 A. Exterior and rated R-10(See INSULATION PHASE). <br /> OR <br /> 0 B. interior(Sae INSULATION PHASE) <br /> ❑ ❑ + Thermal break(s) shall be placed In the slab(S.602:1.4.6,201.1:BUILDING ENVELOPE) <br /> between the conditioned and unconditioned spaces checked below, and extend from the top of the <br /> -slab to the bottom, then underneath toward the conditioned space for a 24'total developed dimension, <br /> t7 dwelling/garage 0 dweiling/connectod space 0 slab edge and foundation wall <br /> ❑ ❑ ORadon mitigation system (V1A0, S. 502.1) shalt be installed if one of the following is checked: " <br /> 0 A. Net foundatioq ventilation area is less than 1 FT2 per 300 1`12 of crawl space <br /> 0 B. Foundation vents are closable. <br /> 0 C. Under flocr plenum acts as supply or return air duct <br /> WSEC Foundation phase requirements: <br /> Inspected by: Date <br /> FRAMING PHASE <br /> [e ❑ 0 All structural panels such as plywood, particle board,wafer board, and oriented strand hoard shall be <br /> labled"EXPOSURE 1""EXTERIOR"or"HUD-APPROVED'(VIAO,S.401.1). <br /> ❑ 0 Insulation baffles shall be placed in attics/ceilings to maintain at least 1"ventilation space and extend at <br /> least 6"vertically above batts or 12"vertically above loosefill Insulation(S. 502.1.4.5). <br /> Od ❑ e Glazing efficiency required undertf a selected option shall be(S.502.1.5, 602,7.2,Table 6-1): <br /> ,or,U.46 (Option 1) Q s U.43 (Options 11) O S.U.40(Option III,M <br /> 0& U.39(Option v);0 s U.36(00on VI) Q s U.35(Optlon Vl1) s VG2(Option VI[i <br /> �mbols used .gir&qu <br /> y r equela >yroeter N 1n "lone then i greeter than or equal s lana Nann or <br /> or equal , <br /> UPDATED SEPTEMBER 1991 <br /> Page 2 of 6 <br />