My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 76TH ST SE 2016-01-01 MF Import
>
Address Records
>
76TH ST SE
>
5
>
5 76TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 11:10:47 AM
Creation date
4/18/2017 11:10:40 AM
Metadata
Fields
Template:
Address Document
Street Name
76TH ST SE
Street Number
5
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mak:, l <br /> J � , <br /> i <br /> Di9rll ANARS/S <br /> CIVIL i $OIL$ ENGINEEIIING <br /> WEACOUTioN TESTS,DAOINFIELD DESIGNS <br /> 2033NE 100m St.5w 1@ w, MIZS SUIT, 100 <br /> 3441014 I <br /> iJanuary 2A, 1092 <br /> Randy Clark i <br /> 237 Elm Street <br /> Everett, Wa. 9e203 <br /> Attention: Mr. Randy Clark and Interested Parties. <br /> Subject: Foundation Soils Inspection. <br /> Site : lots, 19, 20, 23, Flat of Hanabrook. <br /> Dear 4r, Clark, <br /> On January 20, 1992, an inspection of bearing soils exposed in <br /> footing excavations at the above mentioned .site was conducted. <br /> The purpose of this inspection was to determine compliance <br /> with recommendations made by our firm, and stated on page 5, <br /> items 2 and 3. Item 2 recommends engineered deep footings <br /> within 15 feet of the top of the embarkment, and item 3 recom- <br /> mends that footings be placed to bear directly on the struct- <br /> ural fill, and that this inspection be conducted. <br /> During the course of our field investigation, the following <br /> work was conducted : <br /> 1 , Footing distances from the edge of the bank were measured, <br /> 21 Base of footing elevations were determined using a hand <br /> level and stadia rod on an adjacent bench mark, <br /> 3: Footing excavations were measured and probed for loose areas. <br /> I Based on the foregoing work, it is our opinion that the foot- <br /> ings are set back from the edge of the embankment an adequate <br /> distance, and are underlain by compact and competent soils. <br /> We trust that the foregoing information is adequate for your <br /> purposes at this time, and appreciate this opportunity to be <br /> of service to you on this project. If you need additional in- <br /> formation or clarification, please call, <br /> I <br /> Sincerely, <br /> I Earth Analysis <br /> IAll Fay, G lgist <br /> R vrt/wed n p o ed By1 <br /> levon P, y son, F.E. . <br /> ....... AN':YS/S <br />
The URL can be used to link to this page
Your browser does not support the video tag.