Laserfiche WebLink
INSPECTION REPORT <br /> o"60grr Address <br /> Contractor," <br /> Owner __. <br /> Date 7 q 8 — <br /> PPROVAL J PARTIAL APPROVAL <br /> J VtOLATION J CORRECTION REQUESTED <br /> U Corrections listed below MUST BE MADE before work can be approved. <br /> U Please contact inspector and arrange for appointment. <br /> U Was not able to perform Inspection. <br /> U CALL(425)257.8810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector_ ---Date <br /> TYPE OF INSPECTION REQUESTED <br /> J Temp. Elect. raming('.'L J Gas Piping <br /> J Footing rywal,Nailing J Consu lahon <br /> J Foundation U Shear Nailing J Groundwork <br /> J Ductwork U Grid J Struct. Slab <br /> J Wood Stove U Rough-in J Final <br /> J Masonry U Service ,Insulation <br /> UO1her ____ <br /> � _ <br /> BLDG:Pmt. Nq �u u,� U MECH: Pmt.No. <br /> J ELE:C:Pmt, No. U PLBG: Fml.No. _- <br />