Laserfiche WebLink
everett INSPECTION REPORT <br /> ueAddress -�I n <br /> Contractor <br /> Owner <br /> Date <br /> TYPE OF INSPECTION REOUESTED <br /> O BLDG: Pmt. No. 74ECH: Pmt. No. <br /> O ELEC: Pmt. No. O PLBG: Pmt. No. <br /> O Temp.Elect O Framing /Gas Piping <br /> ❑ Footing ❑ Drywall, Nailing O Consultation <br /> D Foundation 0 Shear Nailing O Groundwork <br /> ❑ Ductwork ❑Grid O Struct.Slab <br /> O Wood Stove O Rough-In. ❑ Final <br /> ❑ Masonry ❑Service O <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> OCorrections listed below MUST BE MADE before work can bo approved. <br /> f Cl Please contact Inspector and arrange for appointment. 3 <br /> Ias not able to perform inspection. <br /> )ALL 259.8810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> t AC!- <br /> IC/ Date �C—�= <br />